Laserfiche WebLink
32. Recycled Water Facilities — Recycled water (purple pipe) facilities shall <br />be provided and designed in accordance with Engineering Standards for <br />dual plumbing, irrigation, and other warranted uses per the Recycled <br />Water Ordinance, Chapter 38. Services that are to be supplied by recycled <br />water (either at the time of project completion or at a future date) shall be <br />designed to properly function at the design pressure required by <br />Engineering. Upon a final determination by the City that recycled water is <br />available for the property, the applicant shall connect the project to the <br />recycled water system. [SDR][ENGINEERING] <br />33. Recycled Water Report - The applicant shall hire an engineer licensed in <br />California and experienced in the field of wastewater treatment to prepare <br />a recycled water report for dual plumbed facilities, pursuant to California <br />Water Code section 13522.5 and in accordance with California Code of <br />Regulations sections 60314 and 60323 (found within Title 22, Division 4, <br />Chapter 3). The report shall be submitted prior to project closeout, and will <br />be routed to the Public Works Department for review and coordination. It <br />is recommended a draft of the report is prepared prior to commencing any <br />plumbing work to prevent the need for unplanned changes. [COA] <br />[ENGINEERING] <br />34. Cross -Connection Control Test - Prior to issuance of the certificate of <br />occupancy, all applicable plumbing systems must pass a cross -connection <br />control test, performed by a Cross -Connection Control Specialist Certified <br />through the CA -NV Section of the AWWA and observed by Public Works <br />staff. The cross -connection control test method must be included in the <br />Recycled Water Report. The applicant is responsible for all fees <br />associated with the performance of the cross -connection control test. <br />[COA] [ENGINEERING] <br />35. Discharge Permit for Subterranean Garages - If the subterranean <br />garage requires groundwater pumping into the sewer system, a Discharge <br />fee will apply and a Discharge Permit will be required by Silicon Vallev <br />Clean Water (SCVW) prior to issuance of the building permit. <br />[SDR][ENGINEERING] <br />36. Backflow Protection — Backflow protection on all water services is <br />required. The backflow preventer shall be above grade and located on <br />private property, accessible to the Public Works division for testing. <br />[COA][ENGINEERING] <br />37. Fire Flow - The Project shall meet fire flow requirements as established <br />by the Fire Department which are based on the Fire Code. Fire flow tests <br />are typically performed during the preliminary design phase but must be <br />completed prior to submittal of final design. Applicant shall contact the Fire <br />Department for fire flow requirements, and then submit a written fire flow <br />test request to Engineering. [COA][ENGINEERING] <br />ATTY/RESO.0093/PC RESO GRANTING APPROVAL OF A USE PERMIT -1690 BROADWAY <br />REV: 10-04-17 PR <br />Page 11 of 16 <br />