My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-08-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-08-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 8:48:26 AM
Creation date
7/6/2005 8:16:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/28/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATIACHMENT 4 <br /> <br />9C/3 <br /> <br />BAIR ISLAND STUDY AREA COMMITTEE CONTRACT <br /> <br />Purpose <br />To prepare a Specific Plan for properties in the vicinity of Bair Island Road/Blomquist Extension. <br />The Committee will look at all options for future land uses with the intent to provide a cohesive <br />neighborhood with compatible land uses, adequate facilities for traffic and utilities, and high <br />quality architectural standards. <br /> <br />Project <br />A single document that is approved by the City Council, which clearly describes the allowed <br />land uses and requirements needed to proceed to construction. This document will describe the <br />environmental, land use, and economic issues of development within the Specific Plan area. <br />The document will also discuss architectural, site plan, and infrastructure requirements. <br /> <br />Committee Membership <br />,. Property owners and tenants <br />.,. City Council member <br />,. Planning Commission member <br />.,. Housing and Human Concerns Committee member <br />,. Seaport Industrial Association member <br /> <br />Staff Support <br />.,. Miriam Lynch, Planning & Redevelopment Specialist <br />.,. Gary Lepori, Inspector/Code Enforcement <br />,. Nancy Alexander, Planning Consultant <br />,. Jon Lynch, City Engineer <br />.,. Stanley Zhu, Engineer <br />.,. Joel Patterson, Manager, Engineering & Construction <br />,. Consulting Firm <br /> <br />Committee Operation <br />The Committee will have a facilitator (either the consultant, or another person to facilitate), <br />which will allow input from all members with no one group or person having a greater say than <br />the other. Staff members will provide technical assistance to the Committee and Consultant. <br />The Consultant will be responsible for coordinating input and coming up with the "plan" for the <br />area. The "plan" may not be the consensus of the entire Committee, but it will be the best plan <br />based on the input provided, as well as the Consultant's recommendation. <br /> <br />Schedule <br />The staff members and the Consultant will meet twice per month to review the work prepared by <br />the Consultant, and the input from the Committee. <br /> <br />The Committee is expected to start meeting in November, and be done with their work by <br />February, with Planning Commission and City Council review in Marchand April. Specific Plan <br />adoption is expected in May 2001. <br /> <br />"'r-'---' -----,...--' , <br />
The URL can be used to link to this page
Your browser does not support the video tag.