My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-08-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-08-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2005 8:48:26 AM
Creation date
7/6/2005 8:16:33 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/28/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CAn it). <br /> <br />K <br /> <br />1.2Þ. f> <br /> <br />="= <br />'IF <br /> <br />CCS <br />PLANNING AND ENGINEERING <br />""~~rQ.'T!D <br /> <br />6 Crow Úlnyon Court -San RamoI'., C4. 9!S83-J62J <br />(925) 314-1120 - Ft/X (9.25) 314-1;- <br />£-mtlit: srt1@ccsofftce.c <br /> <br />DATE: <br /> <br />August 9, 2000 <br /> <br />FAX TRANSMISSION <br /> <br />TOTAL PAGES: 2 <br />(Including t!lis tronsmittaJ sheet) <br /> <br />TO: <br /> <br />Peter VorametSanti <br />City of Rcdwood City <br /> <br />FAX: 650-780-7309 <br /> <br />COpy TO: <br /> <br />FROM: I:. Lary TaYlor", . . <br />CGo:¡ Plannmg & .:'71gmeermg. Jnc. <br /> <br />RE: <br /> <br />Redesign ofR WS I Bridge Intersection <br /> <br />PROJECT: Redwood Shores Street <br />System Improvements <br />PRO,J. NO.: CCS 99051 <br /> <br />If you have any problem receiving this fax please caB (925) 3} 4~ J 220 <br /> <br />REMARKS: <br />Attached per your request is our Staff Hour and Fee Proposal for the redesign of the Redwood <br />Shores Parkway / Bridge Parkw3,y intersection. <br /> <br />Please note the following assumptions: <br />1. The eStimated average staff hours per plan sheet assumes that the revised sheets wil! be part of <br />the larger Bid Set. so that the Boiler Plate, Contract Section., and individual technical specs <br />would not have to b~ revised for IL Stand-Alone Bid Set. <br />2. The estimated specification hours assume that the only required activity is to ensure that the <br />current requirements and language is appropriate for the Redesign. The Bid List wil] be revised <br />to conform to the Redesign.. <br />3. Jt is :isStJmed that we have sufficient field survey data to do the Redesign. (We think we have <br />the necessary data. ) <br />4. The average staff hours and colTesponding fee take into consideration that we know the project <br />area and we wilI not n~~ to collect any additional data. <br /> <br />If it is óecióe:d to make this a Stand-Alone Bid Set. then more 5t5ffhours \\1m be necessary. <br /> <br />Likewis::. if this is to be incluàed as an Addendum, adàitjonaJ ~ffort wouìd be m:eded to r~mov: the <br />dra",ings from the cummt s~t and to revise the sp~cs to cjjminatc refcr~nce to Work Sit::: 11. <br /> <br />r did not make contact with Tim McKímson (AAM ), bUt I think hi.s new effort wiJI b:: smarr and I <br />have included my best gueS$ for him in the attaçhed fee. <br /> <br />P :\9905 I \3dmin\cOITCsponócncc\faxcs\fax.23 .rdwdchy. dol <br /> <br />} <br />
The URL can be used to link to this page
Your browser does not support the video tag.