My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-10-16
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-10-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:23:21 PM
Creation date
7/6/2005 8:58:36 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
10/16/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
: , . <br /> ������ ' ; <br /> Ta #he �anara��� �[ayor �nt� �it� CRounci� <br /> From :#�e C I�lana er <br /> October 16, 2000 <br /> Subject <br /> Award of Contract — Red Morton ParkNalota Road Restroom Replacement <br /> Project - Engineering File No. 1302 <br /> Recommendation <br /> Adopt a resolution awarding the contract for the Red Morton ParkNalota Road <br /> Restroom Replacement Project to the lowest responsible bidder, D& D Pipelines of <br /> Greenbrae, California, for their low bid of $124,000. <br /> Background <br /> Heavy usage and structure deterioration has rendered this essential park facility to <br /> become run-down, wet, and unsanitary. Furthermore, the existing facilities were not <br /> designed to meet the Americans with Disabilities Act requirement. <br /> This project will replace the existing restroom with new prefabricated restroom at the <br /> same location. The features included in the new restroom are: <br /> ➢ standard toilets <br /> ➢ wheel chair accessible toilets <br /> ➢ lavatory <br /> ➢ urinal <br /> ➢ mirror <br /> � tissue dispenser <br /> ➢ paper towel dispenser <br /> ➢ sanitary napkin disposal <br /> ➢ grab bars <br /> ➢ drinking fountain <br /> Minor renovation of the existing landscape, irrigation automation system, and sidewalk <br /> are also included in this project. <br /> The Engineer's Estimate for this project is $130,000. <br /> Due to the small size of this project and the construction climate, only one bid was <br /> received .at the bid opening, September 13, 2000. Based on the previous project <br /> (Marlin & Stafford Parks Restroom Facilities — 1998), the low bid was $267,000 for two <br /> restrooms replacement. The bid received from D& D Pipelines of Greenbrae, <br /> California for $124,000 is considered a good and responsive bid. <br /> A complete copy of the agreement is available for review in the City Clerk's Office. <br /> Fiscal Impacts <br /> , _ . _ . ._. _ . ._ _.. . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.