My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-10-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-10-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 3:17:14 PM
Creation date
7/6/2005 9:09:40 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
10/23/2000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
252
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�.z � �g <br /> (a) To the extent it is practicable to do so, MFN shall cooperate with all other <br /> perrnittees, utilities, and permit applicants in the planning, location, and construction of their <br /> joint and several telecommunications facilities within the Public Right-of-Way. Upon completion <br /> of the work of improvement under each Encroachment Permit, MFN shall, within thirty (30) days <br /> of receipt of the demand of the City Engineer, deliver to the City Engineer such maps, plans, <br /> and diagrams as may be required to show, in detail, the exact location, size, depth, and <br /> description of the Facilities within the Public Right-of-Way in relation to all other permittee <br /> telecommunication facilities. The delivery of these maps, plans, and diagrams to City shall not <br /> relieve any third party of any legal or regulatory requirements with respect to location of facilities <br /> in the Right-of-Way and shall not be deemed t� impose any responsibility or duty (other than the <br /> responsibility or duty, if any, imposed by Laws) with respect to any third party. Upon request of <br /> the City, MFN shall pothole its subsurface Facilities, at its sole cost and expense, with respect <br /> to any existing City underground utilities, telecommunication, or other City facilities. <br /> (b) In accordance with the provisions of Chapter 3.1 of Division 5 of Title 1 of the <br /> Government Code of the State of California (g 4216, ef seq.), MFN, as an operator of a <br /> subsurface installation, shall obtain and maintain membership in a regional notification center <br /> (e.g., Underground Service Alert - Northern California), and shall otherwise comply with the <br /> provisions of the referenced chapter, division, and title. MFN shall furnish written proof of such <br /> membership to the City Engineer within thirty (30) days of obtaining such membership. Repeal <br /> of any law requiring such membership shall not negate MFN' obligation to maintain such <br /> membership, unless such repeal disbands or eliminates the notification center, and shall not <br /> negate any notice requirement to City. <br /> (c) MFN agrees to cooperate in the planning, locating and constructing of its Fiber <br /> Optic Network Facilities in utility joint trenches or common duct banks with other similar utilities <br /> Acmt-909 <br /> f/sh/sh/Redwood <br /> FXS:rro <br /> l U/OS/W <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.