My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2000-11-13
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2000
>
AgdaPkt 2000-11-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2005 10:45:12 AM
Creation date
7/6/2005 9:27:15 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
11/13/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />EXHIBIT "All <br /> <br />7, 2 .. V, <br /> <br />Brian Kangas Foulk <br /> <br />Engineers. Surveyors. Planners <br />September 14,2000 <br />BKF No. 960136-26 <br /> <br />Mr. Brian Lee <br />Senior Civil Engineer <br />City of Redwood City <br />1017 Middlefield Road <br />Redwood City, CA 94063 <br /> <br />Transmitted Via Fax and Mail <br /> <br />Subject: Expanded Scope of Work for Additional Services for Redwood Shores <br />Parkway Widening Project - Phase II <br /> <br />Dear Brian: <br /> <br />The scope of work listed in our proposal for "Additional Services for Redwood Shores <br />Widening Project-Phase IT', dated June 28, 2000, was based on modifications to the plans <br />as required to tie-in with the Civil plans for the Towers @ Shores Center Project, Per <br />your request, we have completed the foHowing work beyond the original scope of <br />serVIces: <br /> <br />a. Added City of Redwood City logo to title sheet of approved Redwood Shores <br />Widening Project - Phase II plans. <br />b, Added City of Redwood City bike path and walkway detail to Cross-Section <br />sheets of the approved Redwood Shores Widening Project - Phase II plans. <br />c. Added legend, general and construction notes throughout the entire set of <br />approved Redwood Shores Widening Project - Phase II plans. <br />d, Added striping and signing to Signing, Striping and Marking sheets of the <br />approved Redwood Shores Widening Project - Phase II plans. <br />e, Revised Phase 1 & 2 limits at the intersection of Redwood Shores Parkway and <br />Shoreline Drive throughout the entire set of approved Redwood Shores Widening <br />Project - Phase II plans. <br />f. Modified the' northwest corner of the intersection of Redwood Shores Parkway <br />and Shoreline Drive, throughout the entire set of approved Redwood Shores <br />Widening Project - Phase II plans. to reflect as-built conditions. <br />g. Meetings with Brian Lee to discuss modifications pertaining to the approved <br />Redwood Shores Widening Project - Phase II plans, <br />h, Added reference drawings L3,8 and L3,9 to the approved Redwood Shores <br />Widening Project - Phase II plans. <br />1. Created clip boundaries for future record drawings, <br /> <br />In addition to those services listed above, the following services will be completed for the <br />finaJ plan submittal: <br /> <br />540 Price Avenue" Redwood City, CA 94063 . (650) 482,6300 e FAX (650) 482-6399 <br />/'Í {",~., / <br /> <br />"¡--'~~-r' <br />
The URL can be used to link to this page
Your browser does not support the video tag.