My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res91 11616
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
1990-1999
>
1991
>
Res91 11616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2005 9:44:54 AM
Creation date
7/6/2005 2:29:55 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
10/7/1991
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />04-SM -O-RDWC <br />CRP-L089(637) <br /> <br />DATE: 08/27/91 <br />PAGE: 2 <br /> <br />SPECIAL COVENANTS OR REMARKS <br /> <br />1. All maintenance, involving the physical condition and the <br />operation of the improvements, referred to in Article VI <br />MAINTENANCE of the aforementioned Master Agreement will be <br />performed by the Local Agency and/or the respective agencies as <br />determined by agreement at regular intervals or as required for <br />efficient operation of the comp~eted improvements. <br />~ <br /> <br />2. The Local Agency will utilize the structural plans, <br />specifications and estimates (PS&E) provided by the State and <br />will be responsible for completion of the non-structural PS&E and <br />for preparation of the contract documents, and for <br />advertisement, award and administration of this project. <br /> <br />3. The Local Agency agrees to pay thirty percent (30%) of the total <br />federally eligible seismic safety retrofit portion of the project <br />cost including eligible overhead and other federally <br />nonreimbursable costs in accordance with Senate Bill No. 1742. <br /> <br />4. Federal funds (CRP), if used to pay the thirty percent (30%) <br />share of eligible project costs, either in part or in full, will <br />be limited to the amount indicated on the FNM-76. <br /> <br />5. Unless otherwise agreed to in writing, the total eligible project <br />cost will be limited to no more than a twenty five percent (25%) <br />increase of the amount shown in this agreement. <br /> <br />6. The Local Agency agrees to advertise the project no later than <br />six (6) months after receipt of the structural plans, <br />specifications and estimates from the State. <br /> <br />7. The Local Agency agrees to use their own funds to pay for any <br />portion of the project not eligible under the Seismic Safety <br />Retrofit Program. <br /> <br />8. The Local Agency agrees that the payment of Federal (HBRR) funds <br />will be limited to 55.87% of the total federally eligible seismic <br />safety retrofit portion of the project cost as indicated in the <br />FNÞ1- 7 6 . <br /> <br />9. The Local Agency agrees that-the payment of State (SB 36X) funds <br />will be limited to 14.13% of the total federally eligible seismic <br />safety retrofit portion of the project cost as indicated in the <br />FNM-76. <br /> <br />lO. Eligible preliminary engineering costs associated with bridges <br />which are eliminated from consideration for retrofit under this <br />program shall remain eligible for reimbursement. <br /> <br />"T' - <br />
The URL can be used to link to this page
Your browser does not support the video tag.