My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-03-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-03-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:51:30 PM
Creation date
3/8/2002 9:53:04 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
3/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK ORDER / ADDITIONAL SERVICES <br /> NO. 3 <br /> <br />This Task Order is entered into pursuant to the terms and conditions of the following <br />described agreement (the "Agreement"), entered into by and between the City of <br />Redwood City, a municipal corporation of the State of California (the "City") and the <br />contractor (the "Contractor") hereinafter identified: <br /> <br />Title of Agreement: "Professional Consulting Engineering Services - Water <br /> Recycling Program Support Services" <br /> <br />Contractor: Kennedy/Jenks Consultants <br />Date of Agreement: July 18, 2001 <br /> <br />1. Task Described. Contractor shall perform the following services, which are in <br /> addition to those services described in the Agreement. <br /> <br /> Description of Services: <br /> <br /> Kennedy/Jenks will do the following: <br /> <br /> Design the pipeline alignment in plan view; <br /> <br /> · Prepare details for pipeline/creek crossings; <br /> <br /> · Prepare details for pipeline/utility crossings; <br /> <br /> · Prepare pipeline standard details for required appurtenances and trench <br /> requirements; <br /> <br /> · Submit design drawing mark-ups to Mark Thomas for drafting, and review the <br /> drafted drawings; <br /> <br /> · Review the specifications for the project, prepare inserts for the pipeline design, <br /> submit the inserts to Mark Thomas for conversions to CalTrans format <br /> (Macintosh), and review the prepared specifications; <br /> <br /> · Review the geotechnical investigation report and recommendations, and <br /> incorporate them into the pipeline design; <br /> <br /> · Update the pre-design cost estimate, submit to Mark Thomas for conversion to <br /> CalTrans format, and review; and <br /> <br /> · Provide support services during bidding, including attendance at a pre-bid <br /> conference and responding to contractor and CalTrans questions. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.