Laserfiche WebLink
EXHIBIT A <br />nem EST. <br />No, Qty. Unit oescdptlon Unit Price Item Cost <br />1 1 Labor & <br />Provide and Install a 12 -RU Wall Mount <br />204526 2045 26 <br />Material <br />Cabinet with a 48pon CATS patch penal, <br />$ $ <br />2u wire manager, Lock, shelf and Fans to <br />accommodate new Date Cabling on the <br />Third Floor OF and any miscellaneous <br />labor and materials to complete this task <br />as needed 0�% <br />Doliarsan�r -.6 <br />Cents per hour <br />2 1 Labor & <br />Provide and Install 6 -strand Fiber Optic <br />$ 3535.58 $ 353558 <br />Material <br />Cable, Single Mode, Armored and <br />Planum from the Mezzanine MDF to the <br />new OF Room on the 3itl floor. Irudall <br />Fiber Enclosures; duplex Panel Adapters <br />and LC connectors on both ends and any <br />miscellaneous labor and makrials to <br />complete this task as needed <br />$1767 Dollars and <br />79 Cents per station <br />3 17 Labor & <br />Provide and Install 2 (two) Cal -6 (650 <br />4672.97 4672.97 <br />Material <br />MHz) PVC rated cables from IDF Room <br />$ $ <br />Rack to each designated Cubicles and <br />any miscellaneous laborand materials to <br />complete this task as needed <br />(d $146 Dollars <br />and .03 Cents per hour <br />4 4 Labor & <br />Provide and install 2(two) Cat-$ (650 <br />$—MAY $2357.677 <br />Material <br />MHz) PVC rated cables from IDF Roam <br />Rack to each designated OSIce/FVADF <br />locations and any miscellaneous labor <br />andmaterials complete this task as <br />needed r® $294 Dollars <br />and .70 Cents par station <br />5 3 Labor& <br />Provide and Install 4 or Cat -6 (550 <br />Materiel <br />MHz) PVC rated cables ¢ mid & 2 <br />$ 1397.96 5 1397.95 <br />lovrer>from OF Room Rack to each <br />designated Smart Board locations and <br />any miscellaneous tabor and materials to <br />complete this task as needed <br />® $174 Dollars <br />and 74 Ceras per hour <br />S 1 Labor & <br />Provide and Install ou Cat -S (550 <br />$ 416.47 $ 416.47 <br />Material <br />MHz) PVC rated cables from IDF Room <br />Rack to each designated OF Printer <br />location and any miscellaneous labor and <br />materials to complete this task as needed <br />(G) $416 Dollars and <br />.47 Cents par station <br />7 3 Labor & <br />Provide and Install 1 Load Cats (550 <br />$ 1171.14 $ 1171.14 <br />Material <br />MHz) PVC rated cable from OF Room to <br />each designated AP locations with 20' of <br />slackand any miscellaneous labor and <br />matelots to complete this task as needed <br />$146 Dollars and <br />49 Cents par hour <br />BIDTOTAL <br />$15,59705 <br />REV: 10-12-17 RL <br />Page 6 of 6 <br />ATTY/AG R.2017.232/A M S. N ET <br />