My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 SERA Design and Architecture, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 SERA Design and Architecture, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2018 4:56:23 PM
Creation date
11/17/2017 4:09:43 PM
Metadata
Fields
Template:
Agreement
Contractor Name
SERA Design and Architecture, Inc
PROJECT NAME
Feasibility Analysis for Downtown Parks, Public Open Space Network and Urban Recreation Corridors
RMP File Number
304
Date
11/16/2012
MO Ref
17-193, 18-172
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "A" <br />SCOPE OF SERVICES <br />Consultant will evaluate the feasibility for improvements to City -owned land and its adjacent <br />right-of-way, and will provide recommendations for park development and the potential for <br />creating green linear systems and urban recreation corridors that connect the City's existing and <br />future public open spaces. The study shall report on the best locations for Downtown Parks based <br />on criteria such as potential size, potential amenities, least amount of issues or conflicts, cost <br />effectiveness, and maintenance agreements. The study will also consider methods of integrating <br />parks and public spaces into the Downtown by evaluating the connectivity of City parks and public <br />spaces, their potential connection to bicycle and exercise paths, creek, waterfront and regional trails <br />and open space, and improvements to the right-of-way and pedestrian safety. Consultant will also <br />study how the routes between the parks and open spaces can provide recreational opportunities <br />such as fitness hubs and shaded paths to walk, run and bike, and how these routes will contribute to <br />the City's urban tree canopy. <br />Tasks and Deliverables Table <br />PHASE Feasibility Analysis for Downtown Parks, Public Open Space Network and <br />1 Urban Recreation Corridors <br />Sept -Nov 2017 (or from date of execution of contract) <br />TASKS <br />1.1 Kick-off Meeting with Key Partners and Consultant $ 3,160.00 <br />Deliverable: Work Plan $ 1,935.00 <br />Deliverable: Project Schedule $ 1.935.00 <br />Task Total $ 7,030.00 <br />1.2 Prepare Existing Conditions Data $ 2,079.00 <br />Deliverable: Site-specific Existing Conditions Report $ 6.870.00 <br />Task Total $ 8,949.00 <br />1.3 Sites Assessment $ 2,512.00 <br />Deliverable. Identify Additional Criteria for Site Assessment $ 1,798.00 <br />Deliverable: Site Assessment Report $ 3,782.00 <br />Deliverable: Opportunity and Constraints Presentation to <br />Parks Dept. $ 1,190.00 <br />Deliverable: Opportunity and Constraints Presentation to <br />Community Development Dept. $ 1.190.00 <br />REV: 09-22-17 VR <br />Page 9 of 11 <br />ATTY/AGR.2017.220/SERA Design and Architecture, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.