Laserfiche WebLink
Exhibit C <br />Definitions of Eligible Costs for Reimbursement <br />Project Initiation Documents (PID) - activities necessary to complete PIDs covered under the <br />Scope of Work. <br />Environmental Studies — environmental studies costs, including determination of the <br />appropriate environmental document, preparation of all preliminary engineering for each <br />alternative, including geomantic layouts, determination of right-of-way needs, environmental <br />technical studies (such as air, noise, energy, cultural resources and hazardous waste), and all <br />other studies or activities necessary to prepare and finalize the appropriate documents for Project <br />and environmental approval. <br />Design — design activities such as preparation of design studies; materials and foundation <br />reports; drainage, hydrology and hydraulic reports; surveying and mapping; preparation of the <br />plans, specifications and estimate; preparation of bid documents and Project files; preparation of <br />permit applications and maintenance agreements; coordination of agency reviews and any other <br />activities necessary to prepare final plans specifications and estimate (PS&E) for bid <br />advertisement and award; and management oversight of these tasks except as limited in Section <br />2.2 (b) of the Agreement. <br />Right -of -Way Acquisition — all activities related to right-of-way including determination of <br />right-of-way needs; title searches; preparation of appraisal maps, legal descriptions and plat <br />maps; parcel appraisals and appraisal reviews; hazardous materials—testing and analysis; <br />preparation of right-of-way acquisition documents; activities involved with acquiring rights-of- <br />way including negotiation with property owners and cost associated with condemnation <br />proceedings (including legal costs, expert witness costs, etc., but not including costs related to <br />claims for inverse condemnation), right-of-way capital costs and cost -to -cure impacts related to <br />the acquisition. To the extent allowed by law, Sponsor shall undertake all best efforts so that <br />cleanuo of existing hazardous materials shall remain the liabilitv of the pronerty owner. <br />Services provided for right-of-way activities involved with property not necessary for the <br />Measure A Highway Program -funded Project as defined in the Scope of Work, and the <br />associated costs for all such property, shall be at the sole expense of the Sponsor. <br />Any property not used for construction of the Project, or used for any purpose other than <br />construction of the Project as defined in the Scope of Work, should be identified and the funding <br />agencies should be informed. Any excess right-of-way shall be identified as early as possible in <br />the Project design process and sold. The proceeds from the sale of such property shall be <br />returned to the funding agencies, prorated based on the percentage of funds each agency <br />contributed to the purchase of the property. <br />Construction — construction expenditures for the Project (construction capital, management and <br />inspection, surveys, public outreach, and related activities) that are part of the Scope of Work <br />agreed to by the TA. Sponsor must submit all change orders over $50,000 to the TA for review <br />and written approval before the TA will reimburse the Sponsor with Measure A Funds. <br />REV: 06-23-17 JS <br />Page 21 of 24 <br />