My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 San Mateo County Transportation Authority (TA)
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 San Mateo County Transportation Authority (TA)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 11:39:29 AM
Creation date
11/28/2017 11:43:03 AM
Metadata
Fields
Template:
Agreement
Contractor Name
San Mateo County Transportation Authority (TA)
PROJECT NAME
US 101 Woodside Road (SR 84) Interchange Funding Agreement
RMP File Number
613
Date
8/1/2017
Reso Ref
15207, 15419
MO Ref
12-156, 15-103
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-1: SCOPE OF WORK INFORMATION <br />US 101 Woodside (SR 84) Interchange <br />Design Phase and Right -of -Way Support <br />Sponsoring Agency: City of Redwood City <br />Contact: Jessica Manzi, PE <br />Senior Transportation Coordinator <br />(650)780-7372 <br />i manzi@redwoodcity. org <br />1017 Middlefield Road, Redwood City, CA 94063 <br />Implementing Agency: City of Redwood City <br />Contact: Jessica Manzi, PE <br />Senior Transportation Coordinator <br />(650)780-7372 <br />imanzi(a)redwoodcity. org <br />1017 Middlefield Road, Redwood City, CA 94063 <br />Overall Project Description: <br />Redwood City is proposing to reconstruct the existing US 101- Woodside Road (SR 84) <br />Interchange to alleviate recurring congestion and to increase safety by improving highway and <br />local intersection operations and by improving the accommodation for people walking and <br />bicycling through the interchange. The total length of the Project is 2.3 miles and includes 1.9 <br />miles along US 101 (from Post Mile 4.6 to 6.5) and 0.40 mile along SR 84 (from Post Mile 25.3 <br />to 25.7). <br />The Project scope includes the following primary components: <br />• Widen Woodside Road from four lanes (two eastbound and two westbound) to six lanes <br />(three in each direction) plus turn pockets <br />• Reconstruct ramp connections between Woodside Road and US 101 <br />• Construct direct -connect flyover ramps between northbound U.S 101 and westbound <br />Veterans Boulevard and between eastbound Veterans Boulevard and southbound US 101 <br />• Eliminate the existingfive-legged intersection at Broadway and Woodside Road <br />• Add sidewalks and bicycle facilities on Woodside Road <br />• Replace the existing northbound US 101 ramps with a partial cloverleaf configuration <br />• Realign and replace the existing southbound US 101 ramps with a single, wider <br />diamond -configuration off -ramp and new on-ramp connecting at a new signalized <br />intersection <br />• Add sidewalks on both sides of Woodside Road between Broadway and Bay Road. <br />• Add Class I bikeways on the east side of Woodside Road between Broadway and the <br />Seaport Boulevard/East Bayshore Road/Blomquist Street intersection <br />• Add a Class I bikeway along the UPRR right-of-way that would cross under US 101 to <br />REV: 11-01-19 PR <br />1i"i21?2.1 <br />ATN/AGR.Amend No. 1/San Mateo County Transportation Authority (Page 3 of 6) <br />
The URL can be used to link to this page
Your browser does not support the video tag.