My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-12-04 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-12-04 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2017 8:54:28 AM
Creation date
11/30/2017 4:16:55 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REDWOOD CITY EL CAMINO REAL CORRIDOR PLAN <br />26 <br />SECTION 1.4 <br />DRIVING <br />CONTEXT <br />Traffic and congestion along the Corridor is a significant <br />concern. Drivers have experienced slow traffic, particularly <br />during peak commute hours. Adding to the congestion <br />include left turn queues backing up into travel lanes, short <br />distances between some traffic signals, and irregular inter- <br />sections in a few locations, including the Woodside Road <br />interchange. In addition, while the streets on the west side <br />of EI Camino Real follow a basic grid pattern, streets on the <br />east side are offset from the west, at various angles, and <br />discontinuous, making navigation and cross-town connec- <br />tivity difficult (see also the discussion in Section 1.6, Street <br />Network and Circulation). <br />On -street parallel parking is provided along segments of <br />EI Camino Real where the roadway width permits, and is <br />generally limited to two hours. Along the entire length of <br />the corridor, there is sufficient space to park approximately <br />96 vehicles on the east side of EI Camino Real and 170 ve- <br />hicles on the west side. On -street parking surveys conducted <br />in Spring 2016 indicate that on -street parallel parking is <br />generally underutilized, with an average occupancy of 65 <br />percent on the east side of the street and 70 percent on the <br />west side. Optimal on -street parking occupancy is 85 per- <br />cent, which ensures that space is being used efficiently but <br />that a few spaces on a given block are typically available. <br />However, business owners along the Corridor have clearly <br />expressed that on -street parking is an important resource to <br />ensure that their customers have convenient access to their <br />businesses. <br />a) <br />aD <br />cD <br />Cn <br />Cn <br />
The URL can be used to link to this page
Your browser does not support the video tag.