Laserfiche WebLink
REDWOOD CITY EL CAMINO REAL CORRIDOR PLAN <br />SECTION 5.3 <br />IMPLEMENTING ACTIONS <br />Short -Term <br />Topic Action Corresponding Responsible Party <br />Strategies <br />Right of Way Dimensions. If not available from Caltrans, confirm existing <br />Strategies under <br />Mobility <br />Corridor right of way dimensions with a field inventory and, if needed, full sections Community Development, <br />survey, to determine precise curb -to -curb and property line to property line Engineering <br />dimensions. 1.2, 1.4, and 1.5 <br />Community Development, <br />Mobility Signal Timing. Evaluate signal timing to improve traffic flow. 1 Q Engineering in coordination <br />with Caltrans <br />Activity Centers. Consider establishing an Activity Center Overlay zoning <br />district to require or incentivize: <br />• Active ground floor uses 1 D, 2A, 213, 2C, Community Development <br />Land Use • Plazas, courtyards, or other quasi -public space with landscaping and greenery 2D, 2G, 2F, 4M, 4T Department <br />• Pedestrian amenities, and <br />• Shared parking <br />Also consider reduced parking ratios. <br />68 <br />4 <br />