Laserfiche WebLink
8.B. - Page 137 <br />Ms. Lindy Chan Page 9 October 27, 2017 <br />As summarized in Table 4, the intersection would operate acceptably with a traffic signal, while operation with the <br />roundabout would result in deficient operation during the a.m. peak hour and acceptable operation during the <br />p.m. peak hour. <br />Control Scheme <br />AM Peak Hour <br />PM Peak Hour <br />El Camino Real/Redwood Avenue -Main Street <br />Delay LOS <br />Delay <br />LOS <br />Existina Confiauration <br />EI Camino Real/Redwood Avenue -Main Street <br />0.0 A <br />0.1 <br />A <br />Southwestbound (Main Street) Approach <br />12.7 8 <br />16.8 <br />C <br />Sianalized <br />EI Camino Real/Redwood Avenue -Main Street <br />50.9 D <br />31.6 <br />C <br />Roundabout <br />EI Camino Real/Redwood Avenue -Main Street <br />59.5 E <br />42.1 <br />D <br />Notes: Delay is measured in average seconds per vehicle; LOS = <br />Level of Service; Results for minor approaches to two-way <br />stop -controlled intersections are indicated in italics; Bold <br />text indicates deficient operation <br />Preferred Alternative Traffic Operation <br />A preferred alternative was developed that would balance mobility for all users of EI Camino Real. The following <br />summarizes the recommended improvements that were incorporated into the analysis of the Preferred <br />Alternative. <br />• The corridor was analyzed assuming the signalized intersections were operating under an optimized <br />signal timing coordination scheme. <br />• The following right -turn lanes were removed from the EI Camino Real approaches: <br />o EI Camino Real/Brewster Avenue (Northbound and Southbound) <br />o EI Camino Real/James Avenue (Southbound) <br />o EI Camino Real/Jefferson Avenue (Northbound) <br />o EI Camino Real/Maple Street (Northbound) <br />o EI Camino Real/Roosevelt Avenue (Southbound) <br />• The left -turn phasing on the westbound and eastbound James Avenue approaches at EI Camino <br />Real/James Avenue was modified from permitted phasing to protected phasing. <br />• The EI Camino Real/Redwood Avenue -Main Street was analyzed as a four -legged signalized intersection, <br />with left turns prohibited on northbound and southbound EI Camino Real. <br />The following Level of Service, travel time, and corridor delay summaries evaluated the effects of the <br />recommended improvements as described above. As summarized in Table 5, the intersections would operate <br />acceptably at similar Levels of Service as under existing conditions with the implementation of the preferred <br />alternative. <br />