My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-12-04 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-12-04 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2017 8:54:28 AM
Creation date
11/30/2017 4:16:55 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8.B. - Page 139 <br />Ms. Lindy Chan Page 11 October 27, 2017 <br />Delay at the cross -street approaches with EI Camino Real is reported for the study intersections. Under the <br />preferred alternative configuration, cross -street approach delay would increase overall by 19 percent as compared <br />to existing conditions. The cross -street approach delay is summarized in Table 7. <br />Study Intersection <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />EI Camino Real/Whipple Avenue <br />EI Camino Real/Brewster Avenue <br />EI Camino Real/James Avenue <br />EI Camino Real/Jefferson Avenue <br />EI Camino Real/Maple Street <br />EI Camino Real/Roosevelt Avenue <br />EI Camino Real/Oak Avenue <br />EI Camino Real/Redwood Avenue -Main Street <br />EI Camino Real/Hazel Avenue -Laurel Street <br />EI Camino Real/Oakwood Drive -Dumbarton Ave <br />54.0 <br />Existing <br />50.1 -- <br />Preferred Alternative <br />AM Peak <br />PM Peak <br />AM Peak <br />PM Peak <br />EB <br />WB <br />EB <br />WB <br />EB <br />WB <br />EB <br />WB <br />55.5 <br />42.6 <br />88.8 <br />47.1 <br />55.6 <br />39.6 <br />85.7 <br />52 <br />37.7 <br />37.1 <br />36.8 <br />41.6 <br />35.9 <br />35.3 <br />35.8 <br />40.3 <br />41.3 <br />37.4 <br />86.8 <br />42.9 <br />42.9 <br />49.2 <br />52.1 <br />53.3 <br />40.7 <br />39.3 <br />41.1 <br />47.9 <br />40.3 <br />36.4 <br />45.1 <br />54.9 <br />-- <br />30.5 <br />-- <br />40.2 <br />-- <br />35.8 <br />-- <br />39.0 <br />54.0 <br />-- 51.6 -- 50.7 -- <br />50.1 -- <br />56.0 <br />-- 49.1 -- 53.8 -- <br />48.1 -- <br />-- <br />12.7 -- 16.9 108.3 14.5 <br />57.7 16.3 <br />311.6 <br />51.8 125.6 138.4 311.6 51.8 <br />327 138.4 <br />26 <br />31.8 40.7 43.5 24.3 29.3 <br />39.8 42.4 <br />Total Side -Street Delay <br />622.8 283.2 <br />520.5 418.5 <br />723.4 291.9 <br />741.4 436.6 <br />Change in Side -Street Delay <br />-- -- <br />-- -- <br />100.6 8.7 <br />220.9 18.1 <br />Percent Change in Side -Street Delay <br />-- -- <br />-- -- <br />16% 3% <br />42% 4% <br />Overall Percent Change <br />19% <br />Notes: WB = Westbound; EB = Eastbound; Results are shown as Delay; Delay is measured in average seconds per vehicle <br />SAB/RC1006.M2 <br />Attachments: Operational Analysis Output <br />
The URL can be used to link to this page
Your browser does not support the video tag.