Laserfiche WebLink
HCM 2010 Signalized Intersection Summary HCM 2010 Signalized Intersection Summary <br />3: EI Camino Real & James Ave 9/16/2017 3: EI Camino Real & James Ave 9/16/2017 <br />-A,z'r~�*\ T �'►1 -' <br />BL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR <br />Lane Configurations ) t r ) T. ) t+ ?I ►j t+ ?I <br />Traffic Volume (veh/h) 108 87 153 42 59 57 208 1097 65 72 1069 105 <br />Future Volume (veh/h) 108 87 153 42 59 57 208 1097 65 72 1069 105 <br />Number 7 4 14 3 8 18 5 2 12 1 6 16 <br />Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 <br />Ped -Bike Adj(A_pbT) 0.87 0.83 0.91 0.77 1.00 0.90 1.00 0.85 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Adj Sat Flow, veh/h/In 1881 1863 1881 1508 1720 1900 1881 1827 1545 1681 1845 1900 <br />Adj Flow Rate, veh/h 111 90 155 43 61 52 214 1131 52 74 1102 99 <br />Adj No. of Lanes 1 1 1 1 1 0 1 2 1 1 2 1 <br />Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 <br />Percent Heavy Veh, % 1 2 1 26 7 7 1 4 23 13 3 0 <br />Cap, veh/h 203 353 253 196 141 120 251 2198 748 91 1929 760 <br />Arrive On Green 0.19 0.19 0.19 0.19 0.19 0.19 0.14 0.63 0.63 0.11 1.00 1.00 <br />Sat Flow, veh/h 1119 1863 1333 833 745 635 1792 3471 1181 1601 3505 1380 <br />Grp Volume(v), veh/h 111 90 155 43 0 113 214 1131 52 74 1102 99 <br />Grp Sat Flow(s),veh/h/lnl119 1863 1333 833 0 1380 1792 1736 1181 1601 1752 1380 <br />Q Serve(g_s), s 9.7 4.1 10.7 4.6 0.0 7.2 11.7 17.7 1.7 4.5 0.0 0.0 <br />Cycle Q Clear(g_c), s 16.9 4.1 10.7 8.7 0.0 7.2 11.7 17.7 1.7 4.5 0.0 0.0 <br />Prop In Lane 1.00 1.00 1.00 0.46 1.00 1.00 1.00 1.00 <br />Lane Grp Cap(c), veh/h 203 353 253 196 0 262 251 2198 748 91 1929 760 <br />VIC Ratio(X) 0.55 0.25 0.61 0.22 0.00 0.43 0.85 0.51 0.07 0.81 0.57 0.13 <br />Avail Cap(c a), veh/h 204 354 253 196 0 262 394 2198 748 160 1929 760 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 <br />Upstream Filter(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.65 0.65 0.65 0.92 0.92 0.92 <br />Uniform Delay (d), s/veh 43.2 34.5 37.2 38.2 0.0 35.8 42.0 10.0 7.0 43.8 0.0 0.0 <br />Incr Delay (d2), s/veh 3.0 0.4 4.3 0.6 0.0 1.1 7.0 0.6 0.1 14.2 1.1 0.3 <br />Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 <br />%its BackOfQ(50%),veh/Ir8.2 2.2 4.2 1.1 0.0 2.8 6.3 8.5 0.6 2.3 0.3 0.1 <br />LnGrp Delay(d),s/veh 46.2 34.9 41.5 38.8 0.0 36.9 49.0 10.5 7.2 57.9 1.1 0.3 <br />LnGrp LOS D C D D D D B A E A A <br />Approach Vol, veh/h 356 156 1397 1275 <br />Approach Delay, s/veh 41.3 37.4 16.3 4.4 <br />Approach LOS D D B A <br />5 6 <br />Assigned Phs 1 2 4 5 6 8 <br />Phs Duration (G+Y+Rc), s9.7 67.3 23.0 18.0 59.0 23.0 <br />Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 <br />Max Green Setting (GmakQ,.B 59.0 19.0 22.0 47.0 19.0 <br />Max Q Clear Time (g_c+IV,5; 19.7 18.9 13.7 2.0 10.7 <br />Green Ext Time (p -c), s 0.0 25.4 0.0 0.4 27.6 1.8 <br />Intersection Si <br />HCM 2010 Ctrl Delay 15.3 <br />HCM 2010 LOS <br />EI Camino Real Corridor Plan Synchro 8 Report <br />AM Peak Hour Existing Conditions W -Trans <br />00 <br />EI Camino Real Corridor Plan 9/18/2017 PM Peak Hour Existing Conditions Synchro 9 Report <br />W -Trans Page 4 <br />(D <br />N <br />3 <br />4 <br />5 <br />Assigned Phs 1 <br />2 <br />4 <br />5 <br />6 <br />8 <br />Phs Duration (G+Y+Rc), t;3.1 <br />EBL <br />EBT <br />EBR <br />WBL <br />WBT <br />WBR <br />NBL <br />NBT <br />NBR <br />SBL <br />SBT <br />SBR <br />Lane Configurations <br />) <br />t <br />r <br />) <br />T. <br />2.0 <br />) <br />t+ <br />?I <br />►j <br />t+ <br />?I <br />Traffic Volume (veh/h) <br />62 <br />47 <br />78 <br />113 <br />72 <br />97 <br />89 <br />1379 <br />46 <br />118 <br />1254 <br />75 <br />Future Volume (veh/h) <br />62 <br />47 <br />78 <br />113 <br />72 <br />97 <br />89 <br />1379 <br />46 <br />118 <br />1254 <br />75 <br />Number <br />7 <br />4 <br />14 <br />3 <br />8 <br />18 <br />5 <br />2 <br />12 <br />1 <br />6 <br />16 <br />Initial Q (Qb), veh <br />3 <br />0 <br />0 <br />0 <br />1 <br />0 <br />3 <br />6 <br />2 <br />4 <br />4 <br />1 <br />Ped -Bike Adj(A_pbT) <br />0.96 <br />0.90 <br />0.94 <br />0.87 <br />1.00 <br />0.93 <br />1.00 <br />0.93 <br />Parking Bus, Adj <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Adj Sat Flow, veh/h/In <br />1900 <br />1827 <br />1900 <br />1696 <br />1795 <br />1900 <br />1900 <br />1881 <br />1557 <br />1776 <br />1881 <br />1900 <br />Adj Flow Rate, veh/h <br />65 <br />49 <br />77 <br />119 <br />76 <br />100 <br />94 <br />1452 <br />35 <br />124 <br />1320 <br />73 <br />Adj No. of Lanes <br />1 <br />1 <br />1 <br />1 <br />1 <br />0 <br />1 <br />2 <br />1 <br />1 <br />2 <br />1 <br />Peak Hour Factor <br />0.95 <br />0.95 <br />0.95 <br />0.95 <br />0.95 <br />0.95 <br />0.95 <br />0.95 <br />0.95 <br />0.95 <br />0.95 <br />0.95 <br />Percent Heavy Veh, % <br />0 <br />4 <br />0 <br />12 <br />3 <br />3 <br />0 <br />1 <br />22 <br />7 <br />1 <br />0 <br />Cap, veh/h <br />72 <br />329 <br />261 <br />242 <br />148 <br />149 <br />128 <br />2171 <br />751 <br />165 <br />2264 <br />951 <br />Arrive On Green <br />0.18 <br />0.18 <br />0.18 <br />0.18 <br />0.18 <br />0.18 <br />0.13 <br />1.00 <br />1.00 <br />0.06 <br />0.42 <br />0.42 <br />Sat Flow, veh/h <br />1176 <br />1827 <br />1447 <br />1078 <br />647 <br />852 <br />1810 <br />3574 <br />1234 <br />1691 <br />3574 <br />1500 <br />Grp Volume(v), veh/h <br />65 <br />49 <br />77 <br />119 <br />0 <br />176 <br />94 <br />1452 <br />35 <br />124 <br />1320 <br />73 <br />Grp Sat Flow(s),veh/h/lnl176 <br />1827 <br />1447 <br />1078 <br />0 <br />1499 <br />1810 <br />1787 <br />1234 <br />1691 <br />1787 <br />1500 <br />Q Serve(g_s), s <br />5.4 <br />2.3 <br />4.6 <br />10.5 <br />0.0 <br />10.9 <br />5.0 <br />0.0 <br />0.0 <br />7.2 <br />28.2 <br />2.9 <br />Cycle Q Clear(g_c), s <br />16.3 <br />2.3 <br />4.6 <br />12.7 <br />0.0 <br />10.9 <br />5.0 <br />0.0 <br />0.0 <br />7.2 <br />28.2 <br />2.9 <br />Prop In Lane <br />1.00 <br />1.00 <br />1.00 <br />0.57 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Lane Grp Cap(c), veh/h <br />72 <br />329 <br />261 <br />242 <br />0 <br />271 <br />128 <br />2171 <br />751 <br />165 <br />2264 <br />951 <br />VIC Ratio(X) <br />0.90 <br />0.15 <br />0.30 <br />0.49 <br />0.00 <br />0.65 <br />0.73 <br />0.67 <br />0.05 <br />0.75 <br />0.58 <br />0.08 <br />Avail Cap(c a), veh/h <br />155 <br />329 <br />261 <br />242 <br />0 <br />270 <br />199 <br />2178 <br />752 <br />237 <br />2267 <br />952 <br />HCM Platoon Ratio <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />2.00 <br />2.00 <br />2.00 <br />0.67 <br />0.67 <br />0.67 <br />Upstream Filter(I) <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />0.00 <br />1.00 <br />0.48 <br />0.48 <br />0.48 <br />0.88 <br />0.88 <br />0.88 <br />Uniform Delay (d), s/veh 50.0 <br />34.5 <br />35.5 <br />39.9 <br />0.0 <br />38.2 <br />42.3 <br />0.0 <br />0.0 <br />46.0 <br />18.9 <br />11.4 <br />Incr Delay (d2), s/veh <br />29.8 <br />0.2 <br />0.6 <br />1.5 <br />0.0 <br />5.4 <br />3.8 <br />0.8 <br />0.1 <br />6.9 <br />1.0 <br />0.1 <br />Initial Q Delay(d3),s/veh106.3 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.3 <br />14.8 <br />0.2 <br />0.1 <br />17.0 <br />0.1 <br />0.0 <br />%ile BackOfQ(50 % ),veh/Ir4.7 <br />1.2 <br />1.9 <br />3.2 <br />0.0 <br />5.0 <br />3.5 <br />0.3 <br />0.0 <br />4.9 <br />14.5 <br />1.4 <br />LnGrp Delay(d),s/veh 186.1 <br />34.8 <br />36.1 <br />41.5 <br />0.0 <br />43.9 <br />61.0 <br />1.0 <br />0.1 <br />70.0 <br />19.9 <br />11.6 <br />LnGrp LOS <br />F <br />C <br />D <br />D <br />D <br />E <br />A <br />A <br />E <br />B <br />B <br />Approach Vol, veh/h <br />191 <br />295 <br />1581 <br />1517 <br />Approach Delay, s/veh <br />86.8 <br />42.9 <br />4.5 <br />23.6 <br />Approach LOS <br />F <br />D <br />A <br />C <br />00 <br />EI Camino Real Corridor Plan 9/18/2017 PM Peak Hour Existing Conditions Synchro 9 Report <br />W -Trans Page 4 <br />(D <br />N <br />3 <br />4 <br />5 <br />Assigned Phs 1 <br />2 <br />4 <br />5 <br />6 <br />8 <br />Phs Duration (G+Y+Rc), t;3.1 <br />64.9 <br />22.0 <br />10.6 <br />67.4 <br />22.0 <br />Change Period (Y+Rc), s 4.0 <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />Max Green Setting (GmaJ4.@ <br />56.0 <br />18.0 <br />11.0 <br />59.0 <br />18.0 <br />Max Q Clear Time (g_c+I1�,l <br />2.0 <br />18.3 <br />7.0 <br />30.2 <br />14.7 <br />Green Ext Time (p -c), s 0.1 <br />39.9 <br />0.0 <br />0.1 <br />24.2 <br />0.8 <br />Intersection Si <br />HCM 2010 Ctrl Delay <br />20.1 <br />HCM 2010 LOS <br />00 <br />EI Camino Real Corridor Plan 9/18/2017 PM Peak Hour Existing Conditions Synchro 9 Report <br />W -Trans Page 4 <br />(D <br />N <br />