Laserfiche WebLink
HCM 2010 Signalized Intersection Summary <br />3: EI Camino Real & James Ave 9/15/2017 <br />-A,z'r~�*\ T �'►1 -' <br />Movement EBL <br />EBT <br />EBR WBL WBT WBR <br />NBL <br />NBT NBR <br />SBL <br />SBT <br />SBR <br />Lane Configurations ) <br />t <br />r <br />) <br />T. <br />) <br />t+ <br />j+ <br />►j <br />tT. <br />Traffic Volume (veh/h) 108 <br />87 <br />153 <br />42 <br />59 <br />57 <br />208 <br />1097 <br />65 <br />72 <br />1069 <br />105 <br />Future Volume (veh/h) 108 <br />87 <br />153 <br />42 <br />59 <br />57 <br />208 <br />1097 <br />65 <br />72 <br />1069 <br />105 <br />Number 7 <br />4 <br />14 <br />3 <br />8 <br />18 <br />5 <br />2 <br />12 <br />1 <br />6 <br />16 <br />Initial Q (Qb), veh 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Ped -Bike Adj(A_pbT) 1.00 <br />0.84 <br />1.00 <br />0.72 <br />1.00 <br />0.88 <br />1.00 <br />0.83 <br />Parking Bus, Adj 1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Adj Sat Flow, veh/h/In 1881 <br />1863 <br />1881 <br />1508 <br />1720 <br />1900 <br />1881 <br />1827 <br />1545 <br />1681 <br />1849 <br />1900 <br />Adj Flow Rate, veh/h 111 <br />90 <br />155 <br />43 <br />61 <br />52 <br />214 <br />1131 <br />52 <br />74 <br />1102 <br />99 <br />Adj No. of Lanes 1 <br />1 <br />1 <br />1 <br />1 <br />0 <br />1 <br />2 <br />1 <br />1 <br />2 <br />0 <br />Peak Hour Factor 0.97 <br />0.97 <br />0.97 <br />0.97 <br />0.97 <br />0.97 <br />0.97 <br />0.97 <br />0.97 <br />0.97 <br />0.97 <br />0.97 <br />Percent Heavy Veh, % 1 <br />2 <br />1 <br />26 <br />7 <br />7 <br />1 <br />4 <br />23 <br />13 <br />3 <br />3 <br />Cap, veh/h 140 <br />379 <br />274 <br />50 <br />115 <br />98 <br />250 <br />1855 <br />621 <br />92 <br />1447 <br />130 <br />Arrive On Green 0.08 <br />0.20 <br />0.20 <br />0.03 <br />0.16 <br />0.16 <br />0.09 <br />0.36 <br />0.36 <br />0.08 <br />0.60 <br />0.60 <br />Sat Flow, veh/h 1792 <br />1863 <br />1350 <br />1436 <br />722 <br />615 <br />1792 <br />3471 <br />1161 <br />1601 <br />3199 <br />287 <br />Grp Volume(v), veh/h 111 <br />90 <br />155 <br />43 <br />0 <br />113 <br />214 <br />1131 <br />52 <br />74 <br />604 <br />597 <br />Grp Sat Flow(s),veh/h/lnl792 <br />1863 <br />1350 <br />1436 <br />0 <br />1337 <br />1792 <br />1736 <br />1161 <br />1601 <br />1757 <br />1728 <br />Q Serve(g_s), s 5.7 <br />3.8 <br />9.7 <br />2.8 <br />0.0 <br />7.3 <br />11.1 <br />25.2 <br />2.8 <br />4.3 <br />23.7 <br />23.9 <br />Cycle Q Clear(g_c), s 5.7 <br />3.8 <br />9.7 <br />2.8 <br />0.0 <br />7.3 <br />11.1 <br />25.2 <br />2.8 <br />4.3 <br />23.7 <br />23.9 <br />Prop In Lane 1.00 <br />1.00 <br />1.00 <br />0.46 <br />1.00 <br />1.00 <br />1.00 <br />0.17 <br />Lane Grp Cap(c), veh/h 140 <br />379 <br />274 <br />50 <br />0 <br />214 <br />250 <br />1855 <br />621 <br />92 <br />795 <br />782 <br />VIC Ratio(X) 0.79 <br />0.24 <br />0.56 <br />0.87 <br />0.00 <br />0.53 <br />0.86 <br />0.61 <br />0.08 <br />0.80 <br />0.76 <br />0.76 <br />Avail Cap(c a), veh/h 172 <br />379 <br />274 <br />107 <br />0 <br />228 <br />286 <br />1855 <br />621 <br />170 <br />795 <br />782 <br />HCM Platoon Ratio 1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />0.67 <br />0.67 <br />0.67 <br />1.33 <br />1.33 <br />1.33 <br />Upstream Filler(I) 1.00 <br />1.00 <br />1.00 <br />1.00 <br />0.00 <br />1.00 <br />0.56 <br />0.56 <br />0.56 <br />0.89 <br />0.89 <br />0.89 <br />Uniform Delay (d), s/veh 42.6 <br />31.3 <br />33.7 <br />45.2 <br />0.0 <br />36.2 <br />41.7 <br />22.1 <br />14.9 <br />42.9 <br />15.0 <br />15.0 <br />Incr Delay (d2), s/veh 18.6 <br />0.3 <br />2.7 <br />33.0 <br />0.0 <br />2.0 <br />12.1 <br />0.8 <br />0.1 <br />13.4 <br />6.1 <br />6.2 <br />Initial Q Delay(d3),s/veh 0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />%ile BackOfQ(50 % ),veh/Ir8.6 <br />2.0 <br />3.8 <br />1.6 <br />0.0 <br />2.8 <br />6.3 <br />12.3 <br />0.9 <br />2.2 <br />12.7 <br />12.5 <br />LnGrp Delay(d),s/veh 61.2 <br />31.7 <br />36.4 <br />78.1 <br />0.0 <br />38.3 <br />53.8 <br />23.0 <br />15.1 <br />56.3 <br />21.0 <br />21.3 <br />LnGrp LOS E <br />C <br />D <br />E <br />D <br />D <br />C <br />B <br />E <br />C <br />C <br />Approach Vol, vehlh <br />356 <br />156 <br />1397 <br />1275 <br />Approach Delay, s/veh <br />42.9 <br />49.2 <br />27.4 <br />23.2 <br />Approach LOS <br />D <br />D <br />C <br />C <br />Timer � 1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />Assigned Phs 1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />Phs Duration (G+Y+Rc), s9.4 <br />54.2 <br />7.2 <br />23.1 <br />17.1 <br />46.5 <br />11.3 <br />19.0 <br />Change Period (Y+Rc), s 4.0 <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />Max Green Setting (GmaAQ,.B <br />43.0 <br />7.0 <br />18.0 <br />15.0 <br />38.0 <br />9.0 <br />16.0 <br />Max Q Clear Time (g_c+IV,3 <br />27.2 <br />4.8 <br />11.7 <br />13.1 <br />25.9 <br />7.7 <br />9.3 <br />Green Ext Time (p -c), s 0.0 <br />12.8 <br />0.0 <br />1.0 <br />0.1 <br />10.1 <br />0.0 <br />0.3 <br />Intersection Sum <br />HCM 2010 Ctrl Delay <br />28.5 <br />HCM 2010 LOS <br />00 <br />HCM 2010 Signalized Intersection Summary 00 <br />3: EI Camino Real & James Ave 9/15/2017 r <br />T <br />CID <br />Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR --.x <br />Lane Configurations ) t r ) T. ) t+ j+ ►j tT. rr <br />Traffic Volume (veh/h) 62 47 78 113 72 97 89 1379 46 118 1254 75 W <br />Future Volume (veh/h) 62 47 78 113 72 97 89 1379 46 118 1254 75 <br />Number 7 4 14 3 8 18 5 2 12 1 6 16 <br />Initial Q (Qb), veh 3 0 0 0 1 0 3 6 2 4 4 1 <br />Ped -Bike Adj(A_pbT) 1.00 0.87 1.00 0.87 1.00 0.92 1.00 0.92 <br />Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 <br />Adj Sat Flow, veh/h/In 1900 1827 1900 1696 1795 1900 1900 1881 1557 1776 1882 1900 <br />Adj Flow Rate, veh/h 65 49 77 119 76 100 94 1452 35 124 1320 73 <br />Adj No. of Lanes 1 1 1 1 1 0 1 2 1 1 2 0 <br />Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 <br />Percent Heavy Veh, % 0 4 0 12 3 3 0 1 22 7 1 1 <br />Cap, veh/h 94 260 201 144 137 150 125 1836 634 159 1858 101 <br />Arrive On Green 0.05 0.14 0.14 0.09 0.18 0.18 0.13 1.00 1.00 0.06 0.36 0.36 <br />Sat Flow, veh/h 1810 1827 1404 1616 647 852 1810 3574 1223 1691 3429 189 <br />Grp Volume(v), veh/h 65 49 77 119 0 176 94 1452 35 124 687 706 <br />Grp Sat Flow(s),veh/h/lnl810 1827 1404 1616 0 1499 1810 1787 1223 1691 1788 1830 <br />Q Serve(g_s), s 3.5 2.3 4.9 7.1 0.0 10.7 4.9 0.0 0.0 7.1 32.2 32.4 <br />Cycle Q Clear(g_c), s 3.5 2.3 4.9 7.1 0.0 10.7 4.9 0.0 0.0 7.1 32.2 32.4 <br />Prop In Lane 1.00 1.00 1.00 0.57 1.00 1.00 1.00 0.10 <br />Lane Grp Cap(c), veh/h 94 260 201 144 0 273 125 1836 634 159 968 991 <br />VIC Ratio(X) 0.69 0.19 0.38 0.82 0.00 0.65 0.75 0.79 0.06 0.78 0.71 0.71 <br />Avail Cap(c a), veh/h 166 298 229 165 0 271 148 1855 635 173 972 994 <br />HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 0.67 0.67 0.67 <br />Upstream Filler(I) 1.00 1.00 1.00 1.00 0.00 1.00 0.42 0.42 0.42 0.86 0.86 0.86 <br />Uniform Delay (d), s/veh 46.0 37.0 38.1 43.9 0.0 37.3 41.7 0.3 0.0 45.4 24.8 24.9 <br />Incr Delay (d2), s/veh 8.7 0.3 1.2 25.0 0.0 5.2 7.3 1.5 0.1 16.5 3.8 3.7 <br />Initial Q Delay(d3),s/veh 23.6 0.0 0.0 0.0 0.0 0.3 16.7 0.4 0.1 20.8 0.1 0.1 <br />%ile BackOfQ(50 % ),veh/Ir2.9 1.2 1.9 4.2 0.0 4.9 3.6 2.1 0.2 5.4 17.3 17.7 <br />LnGrp Delay(d),s/veh 78.3 37.4 39.3 68.8 0.0 42.8 65.8 2.2 0.2 82.7 28.7 28.7 <br />LnGrp LOS E D D E D E A A F C C <br />Approach Vol, vehlh 191 295 1581 1517 <br />Approach Delay, s/veh 52.1 53.3 5.9 33.1 <br />Approach LOS D D A C <br />Wr1 2 3 4 5 6 <br />Assigned Phs 1 2 3 4 5 6 7 8 <br />Phs Duration (G+Y+Rc), t2.8 54.9 12.8 17.6 10.4 57.3 8.6 21.7 <br />Change Period (Y+Rc), s 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 <br />Max Green Setting (GmaAQ,.@ 46.0 10.0 16.0 8.0 48.0 9.0 17.0 <br />Max Q Clear Time (g_c+l f ,t 2.0 9.1 6.9 6.9 34.4 5.5 12.7 <br />Green Ext Time (p -c), s 0.0 33.9 0.0 0.5 0.0 12.3 0.0 0.7 <br />Intersection Sum <br />HCM 2010 Ctrl Delay 23.8 <br />HCM 2010 LOS <br />EI Camino Real Corridor Plan Synchro 9 Report EI Camino Real Corridor Plan Synchro 9 Report <br />AM Peak Hour Existing Conditions Preferred Alternative W -Trans PM Peak Hour Existing Conditions Preferred Alternative W -Trans <br />