Laserfiche WebLink
HCM 2010 Signalized Intersection Summary <br />5: EI Camino Real & Maple St <br />9/15/2017 <br />1< <br />t <br />I <br />rA <br />\ <br />i <br />Traffic Volume (veh/h) 92 <br />Movement i WBL <br />WBR <br />NBT <br />NBR <br />SBL <br />SBT <br />63 1335 <br />Lane Configurations ) <br />r <br />fT. <br />7 4 <br />) <br />t+ <br />0 <br />Traffic Volume (veh/h) 61 <br />70 <br />1290 <br />75 <br />70 <br />1481 <br />1.00 1.00 <br />Future Volume (veh/h) 61 <br />70 <br />1290 <br />75 <br />70 <br />1481 <br />Adj Flow Rate, veh/h 94 <br />Number 1 <br />16 <br />8 <br />18 <br />7 <br />4 <br />1 2 <br />Initial Q (Qb), veh 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1 <br />Ped -Bike Adj(A_pbT) 1.00 <br />1.00 <br />264 2325 <br />0.99 <br />1.00 <br />Arrive On Green 0.16 <br />0.16 1.00 <br />Parking Bus, Adj 1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Grp Volume(v), veh/h 94 <br />Adj Sat Flow, veh/h/In 1863 <br />1881 <br />1830 <br />1900 <br />1863 <br />1845 <br />1810 1770 <br />Adj Flow Rate, veh/h 65 <br />74 <br />1372 <br />80 <br />74 <br />1576 <br />0.0 <br />Adj No. of Lanes 1 <br />1 <br />2 <br />0 <br />1 <br />2 <br />264 1195 <br />Peak Hour Factor 0.94 <br />0.94 <br />0.94 <br />0.94 <br />0.94 <br />0.94 <br />Avail Cap(c a), veh/h 295 <br />Percent Heavy Veh, % 2 <br />1 <br />4 <br />4 <br />2 <br />3 <br />1.00 1.00 <br />Cap, veh/h 302 <br />272 <br />2165 <br />126 <br />95 <br />2610 <br />0.0 <br />Arrive On Green 0.17 <br />0.17 <br />1.00 <br />1.00 <br />0.11 <br />1.00 <br />0.0 0.0 <br />Sat Flow, veh/h 1774 <br />1599 <br />3429 <br />194 <br />1774 <br />3597 <br />LnGrp Delay(d),s/veh 39.0 <br />Grp Volume(v), veh/h 65 <br />74 <br />713 <br />739 <br />74 <br />1576 <br />E A <br />Grp Sat Flow(s),veh/h/lnl774 <br />1599 <br />1738 <br />1793 <br />1774 <br />1752 <br />Q Serve(g_s), s 3.0 <br />3.8 <br />0.0 <br />0.0 <br />3.8 <br />0.0 <br />Cycle Q Clear(g_c), s 3.0 <br />3.8 <br />0.0 <br />0.0 <br />3.8 <br />0.0 <br />Prop In Lane 1.00 <br />1.00 <br />0.11 <br />1.00 <br />Lane Grp Cap(c), veh/h 302 <br />272 <br />1128 <br />1163 <br />95 <br />2610 <br />VIC Ratio(X) 0.22 <br />0.27 <br />0.63 <br />0.64 <br />0.78 <br />0.60 <br />Avail Cap(c a), veh/h 302 <br />272 <br />1128 <br />1163 <br />170 <br />2610 <br />HCM Platoon Ratio 1.00 <br />1.00 <br />2.00 <br />2.00 <br />2.00 <br />2.00 <br />Upstream Filler(I) 1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Uniform Delay (d), s/veh 33.6 <br />33.9 <br />0.0 <br />0.0 <br />41.5 <br />0.0 <br />Incr Delay (d2), s/veh 1.6 <br />2.5 <br />2.7 <br />2.7 <br />13.1 <br />1.0 <br />Initial Q Delay(d3),s/veh 0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />0.0 <br />%ile BackOfQ(50 % ),veh/lnl .6 <br />3.7 <br />0.8 <br />0.9 <br />2.2 <br />0.4 <br />LnGrp Delay(d),s/veh 35.2 <br />36.4 <br />2.7 <br />2.7 <br />54.5 <br />1.0 <br />LnGrp LOS D <br />D <br />A <br />A <br />D <br />A <br />Approach Vol, veh/h 139 <br />1452 <br />1650 <br />Approach Delay, s/veh 35.8 <br />2.7 <br />3.4 <br />Approach LOS D <br />A <br />A <br />Time <br />Assigned Phs <br />4 <br />6 <br />7 8 <br />Phs Duration (G+Y+Rc), s <br />74.0 <br />20.0 <br />9.0 65.0 <br />Change Period (Y+Rc), s <br />4.0 <br />4.0 <br />4.0 4.0 <br />Max Green Setting (Gmax), s <br />70.0 <br />16.0 <br />9.0 57.0 <br />Max Q Clear Time (g_c+ll), s <br />2.0 <br />5.8 <br />5.8 2.0 <br />Green Ext Time (p -c), s <br />50.1 <br />0.3 <br />0.0 42.8 <br />Intersection Summary <br />HCM 2010 Ctrl Delay <br />4.5 <br />HCM 2010 LOS <br />A <br />tD <br />HCM 2010 Signalized Intersection Summary W <br />5: EI Camino Real & Maple St 9/15/201 , <br />� t T I' �► 1 � <br />Movement �BL WBR NBT NBR <br />SBL SBT � <br />Lane Configurations ) <br />r fT. <br />8 <br />) t+ Ul <br />Traffic Volume (veh/h) 92 <br />78 1476 <br />69 <br />63 1335 Ul <br />Future Volume (veh/h) 92 <br />78 1476 <br />69 <br />63 1335 <br />Number 1 <br />16 8 <br />18 <br />7 4 <br />Initial Q (Qb), veh 0 <br />0 0 <br />0 <br />0 0 <br />Ped -Bike Adj(A_pbT) 1.00 <br />1.00 <br />1.00 <br />1.00 <br />Parking Bus, Adj 1.00 <br />1.00 1.00 <br />1.00 <br />1.00 1.00 <br />Adj Sat Flow, veh/h/In 1900 <br />1900 1882 <br />1900 <br />1900 1863 <br />Adj Flow Rate, veh/h 94 <br />80 1506 <br />70 <br />64 1362 <br />Adj No. of Lanes 1 <br />1 2 <br />0 <br />1 2 <br />Peak Hour Factor 0.98 <br />0.98 0.98 <br />0.98 <br />0.98 0.98 <br />Percent Heavy Veh, % 0 <br />0 1 <br />1 <br />0 2 <br />Cap, veh/h 295 <br />264 2325 <br />108 <br />83 2672 <br />Arrive On Green 0.16 <br />0.16 1.00 <br />1.00 <br />0.05 0.76 <br />Sat Flow, veh/h 1810 <br />1615 3573 <br />161 <br />1810 3632 <br />Grp Volume(v), veh/h 94 <br />80 772 <br />804 <br />64 1362 <br />Grp Sat Flow(s),veh/h/lnl810 <br />1615 1788 <br />1853 <br />1810 1770 <br />Q Serve(g_s), s 4.5 <br />4.3 0.0 <br />0.0 <br />3.4 15.0 <br />Cycle Q Clear(g_c), s 4.5 <br />4.3 0.0 <br />0.0 <br />3.4 15.0 <br />Prop In Lane 1.00 <br />1.00 <br />0.09 <br />1.00 <br />Lane Grp Cap(c), veh/h 295 <br />264 1195 <br />1238 <br />83 2672 <br />VIC Ratio(X) 0.32 <br />0.30 0.65 <br />0.65 <br />0.77 0.51 <br />Avail Cap(c a), veh/h 295 <br />264 1195 <br />1238 <br />166 2672 <br />HCM Platoon Ratio 1.00 <br />1.00 2.00 <br />2.00 <br />1.00 1.00 <br />Upstream Filler(I) 1.00 <br />1.00 1.00 <br />1.00 <br />1.00 1.00 <br />Uniform Delay (d), s/veh 36.2 <br />36.1 0.0 <br />0.0 <br />46.2 4.8 <br />Incr Delay (d2), s/veh 2.8 <br />2.9 2.7 <br />2.7 <br />13.8 0.7 <br />Initial Q Delay(d3),s/veh 0.0 <br />0.0 0.0 <br />0.0 <br />0.0 0.0 <br />%ile BackOfQ(50 % ),veh/Ir2.5 <br />4.2 0.9 <br />0.9 <br />2.0 7.4 <br />LnGrp Delay(d),s/veh 39.0 <br />39.0 2.7 <br />2.7 <br />60.0 5.5 <br />LnGrp LOS D <br />D A <br />A <br />E A <br />Approach Vol, veh/h 174 <br />1576 <br />1426 <br />Approach Delay, s/veh 39.0 <br />2.7 <br />7.9 <br />Approach LOS D <br />A <br />A <br />Assigned Phs <br />4 <br />6 <br />7 <br />8 <br />Phs Duration (G+Y+Rc), s <br />78.0 <br />20.0 <br />8.5 <br />69.5 <br />Change Period (Y+Rc), s <br />4.0 <br />4.0 <br />4.0 <br />4.0 <br />Max Green Setting (Gmax), s <br />74.0 <br />16.0 <br />9.0 <br />61.0 <br />Max Q Clear Time (g_c+ll ), s <br />17.0 <br />6.5 <br />5.4 <br />2.0 <br />Green Ext Time (p -c), s <br />42.4 <br />0.3 <br />0.0 <br />43.5 <br />Intersection Summary <br />HCM 2010 Ctrl Delay <br />7.0 <br />HCM 2010 LOS <br />A <br />EI Camino Real Corridor Plan Synchro 9 Report EI Camino Real Corridor Plan Synchro 9 Report <br />AM Peak Hour Existing Conditions Preferred Alternative W -Trans PM Peak Hour Existing Conditions Preferred Alternative W -Trans <br />