Laserfiche WebLink
<br />¿;: / ð- /s- <br /> <br />. Agreement for Production and Delivery of Recycled Water, between the South Bayside <br />System Authority and the City of Redwood City (8/2004) <br /> <br />. Lease Agreement between the South Bayside System Authority and the City of Redwood <br />City for Recycled Water Treatment / Storage / Pumping Facility Site (8/2004) <br /> <br />. Professional Services Agreements with Kennedy/Jenks Consultants for Recycled Water <br />Distribution System Design Services and Customer Site Retrofits Design Services (8/2004) <br /> <br />. Approval of City of Redwood City Use Permit - construction of recycled water facilities at the <br />SBSA treatment plant site (10/2004) <br /> <br />. Award of low bid - SBSA pre-purchase of construction steel (10/2004) <br /> <br />. State of California Department of Health Services (DHS) conditional approval of Redwood <br />City Recycled Water Project Engineering Report (10/2004) <br /> <br />. Approval of design documents and call for bids for the Recycled Water Project Disinfection, <br />Storage and Pumping (DSP) Facilities at SBSA (10/2004) <br /> <br />. Approval of the Water Financing Plan - 2004 Update (1/2005) <br /> <br />. Approval of issuance of first series of Water Revenue Bonds in the amount of $36M, to <br />finance the design and construction of recycled water facilities (1/2005) <br /> <br />. Award of construction contract for the Recycled Water Project DSP Facilities at SBSA <br />(1/2005) <br /> <br />. Notice to Proceed issued by SBSA for commencement of construction (3/2005) <br /> <br />. Approval of design documents / call for bids (4/2005): <br /> <br />. Construction of SBSA Facilities Project -Dual Media Filter Modifications <br /> <br />. Construction of SBSA Facilities Project - Connecting Pipelines and Utilities <br /> <br />Redwood City Recycled Water Project <br /> <br />Progress Report 2005 <br /> <br />Redwood City Recycled Water Task Force Recommendations - Final Report <br />p:\pw-proj\200410468025 rwc rvcycled retrofit & support svcltask 11 program support\task force status reportlfinal report\progress report on U recommendationsjinal.doc <br /> <br />Page 7 <br />