Laserfiche WebLink
<br />....5: /.0 . ¿;- <br />Kennedy/Jenks Consultants <br /> <br />Memorandum <br />Peter Ingram, Redwood City Public Works Services Director <br />10 August 2005 <br />Page 3 <br /> <br />. A web-based project portal has been developed jointly between the City, Data Instincts <br />and K/J to efficiently disseminate project information to consultants, City and SBSA staff, <br />and outside agencies. The DHS has agreed to review the site retrofit plans <br />electronically via a link within the portal, which will improve their review time and prevent <br />submittals from being lost. The portal also has provided efficiencies and cost savings in <br />the area of document reproduction and delivery. <br /> <br />The FY 04/05 budget allocation is only 66% spent and approximately $196,368 remains. The <br />following factors contributed to the reduced level of spending over the past year: <br /> <br />. The retrofit project team has combined resources with the recycled water pipeline design <br />team (under separate contract) to determine locations of existing utility and recycled <br />water laterals in a more efficient manner than was originally anticipated. <br /> <br />. Site retrofit design work could not be advanced beyond the 60% design level before <br />obtaining DHS acceptance of the program operating strategy or development of the <br />City's Application for Recycled Water Service, both of which were recently completed. <br /> <br />Kennedy/Jenks anticipates that in the next fiscal year, the project team will need to increase its <br />overall level of effort, above that provided in FY 2004/2005, for the following reasons: <br /> <br />. Now that DHS has accepted the operating strategy and the Application for Recycled <br />Water Service has been developed, the 60% level of design for 32 site retrofits will need <br />to be rapidly completed, submitted to the DHS for approval, and move into construction. <br /> <br />. The industrial customer base is being fully explored and site retrofit will expand from <br />irrigation uses to include non-irrigation uses (cooling, etc) further increasing the number <br />of sites engaged by the project team. <br /> <br />. As site retrofits move forward into construction, and the team will be expanded to <br />support both design and construction services. <br /> <br />It is anticipated that an equivalent of 2.5 to 3.5 full time equivalent employees (FTEs) will need <br />to work on site retrofit design and construction activities. The effort level and site retrofit <br />complexities have uncertainties, and providing a budget authorization that corresponds to the <br />upper limit is suggested. The total budget authorization is requested to increase from needed <br />for next year is anticipated to range from $574,100 to $1,066,000. The unspent authorization <br />($196,363) would roll-over into FY 2005/2006 and an additional $492,000 would be added, <br />making a total of $688,368 available to the project team. <br /> <br />p:\pw-prO \2004\0468025 /wc recycled retrofit & support svcltask 01 proj mgmtlprogress reports & invoiceslannual project update to council.doc <br />