My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res17 15632
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2017
>
Res17 15632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 12:58:03 PM
Creation date
12/6/2017 12:54:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
12/4/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Lindy Chan Page 6 October 27, 2017 <br /> El Camino Real at Redwood Avenue-Main Street (See Figure 2) <br />o Reconstruct the intersection by relocating the Main Street leg to align with the existing Redwood <br />Avenue leg <br />o Close access to and from Spruce Street at Main Street to vehicle traffic <br />o Rededicate the remaining right-of-way as a result of reconfiguring this area to construct a plaza, <br />which could be used for gateway treatments, including trees and signs <br />o The turn radii would be reduced to reduce vehicle turning speeds into and out of the side streets <br />o Install protected intersection treatments and provide cross-bikes along El Camino Real <br />o Install a traffic signal <br /> El Camino Real – Woodside Road Overcrossing (See Figure 2) <br />o Due to the constraints of the existing Woodside Road bridge, bicycles would need to be <br />conveyed through this area via shared wide sidewalks that would accommodate one-way bike <br />traffic and pedestrians.
The URL can be used to link to this page
Your browser does not support the video tag.