My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 All Area Electric Constr
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 All Area Electric Constr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2006 11:59:29 AM
Creation date
8/22/2005 10:26:34 AM
Metadata
Fields
Template:
Agreement
Contractor Name
All Area Electric Contruction
PROJECT NAME
Fire Station 10 - emergency generator replacement
RMP File Number
304
Date
8/16/2005
MO Ref
06-141
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />B. <br /> <br />Liquidated Damaqes <br />1. City and Contractor recognize that time is of the essence of this Agreement <br />and that City will suffer financia' loGS in the form of lost revenues, contract <br />administration expenses (including project management and consultants' <br />expenses), delay and loss of public use, if the Work is not completed within <br />the time specified in paragraph II I. A. 1 above plus any extensions thereof <br />allowed in accordance with the Contract Documents. Consistent with <br />Document 00700 (General Conditions), Contractor and City agree that <br />because of the nature of the Project, it would be impractical or extremely <br />difficult to fix the amount of actual damages incurred by City because of a <br />delay in completion of the Work. <br /> <br />2. <br /> <br />Accordingly, City and Contractor agree that Contractor shall pay City Five <br />Hundred and No/100 Dollars ($500.00) for each Day that expires after the <br />time specified in Paragraph II I. A. 1 of this Document 00520 for Contractor to <br />achieve Substantial Completion, until such date as contractor achieves <br />Substantial Completion. <br /> <br />C. <br /> <br />Liquidated damages for delay shall only cover and be in lieu of the actual damages <br />suffered by City as a result of delay referenced above. Liquidated damages shall <br />not cover the cost of completion of the Work, damages resulting from defective <br />work, cost of temporary replacement facilities, damages suffered by others who <br />then seek to recover their damages from City (for example, delay claims of other <br />contractors or subcontractors), and defense costs thereof. <br /> <br />IV. <br /> <br />CITY'S ENGIÑEER AND REPRESENTATIVES <br />Reserved <br /> <br />V. <br /> <br />CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> <br />In order to induce City to enter into this Agreement, Contractor makes the following <br />representations and warranties: <br /> <br />A. <br /> <br />Contractor has visited the Site and has examined thoroughly and understood the <br />nature and extent of the Work, Site, locality, actual conditions, as built conditions, <br />and all local conditions and federal, state and local laws and regulations that in any <br />manner may affect cost, progress, performance or furnishing of Work or which <br />relate to any aspect of the design and the means, methods, techniques, sequences <br />or procedures of construction to be employed by Contractor and safety precautions <br />and programs incident thereto. . <br /> <br />B. <br /> <br />Contractor has examined thoroughly and understood all reports of exploration and <br />tests of subsurface conditions, drawings or reports, available for design and <br />construction purposes, of physical conditions, or which may be apparent at the Site <br />and accepts the determination set forth in these documents and Document 00700 <br />(General Conditions) of the limited extent of the information contained in these <br />documents upon which the Contractor may be entitled to rely. Contractor agrees <br />that except for the information so identified, Contractor does not and shall not rely <br />on any other information contained in these documents. <br /> <br />C. Contractor has considered the physical conditions at or contiguous to the Site or <br />otherwise which may affect the cost, progress, performance or furnishing of Work, <br />Atty/Agr/2005.026 <br />062705 2 <br /> <br />-- T <br />
The URL can be used to link to this page
Your browser does not support the video tag.