Laserfiche WebLink
<br />07/11/2005 14:46 FAX 5104875332 <br /> <br />FerminSierraConst <br /> <br />I£i 002/002 <br /> <br />EXHIBIT "A" <br /> <br /> <br />em in Sit" a C onst ruction, Jnc . <br /> <br />3;2203 ALMADEN 8LVD. .. UNION CI"I'Y, CA Q41587 " (.10) 47' -1474 .. FAX (810) "'87-8332- <br />LICEN-IC II '7E178 1 , CBItfM!J~ C:IUIITII'III:C <br /> <br />July 11, 2005 <br /> <br />Grace Le <br />City of Redwood City <br />Engineering <br /> <br />RE: <br /> <br />Proposal for 2004-2005 Sanitary Sewer Improvement Project - Point <br />Repair {Along EI Camino Real, between Hazel Avenue and Hemlock <br />Avenue} <br /> <br />Mobilization, Resident/Business Notification, lump Sum <br />Traffic Control, Lump Sum <br />Trench Shoring Lump Sum <br />Remove existing 8" CIP, replace w/8 PVC~SDR26 @ two (2) <br />locations as shown on plans. apDroX. 30 IF @ $750 pJlF <br />Total of this Proposal <br /> <br />1. <br />2. <br />3. <br />4. <br /> <br />= <br /> <br />= <br /> <br />5,000 <br />2,500 <br />5,000 <br /> <br />::: <br /> <br />== 22.500 <br />= 35,000 <br /> <br />Notes: <br />. All work along EI Camino Real to be performed as per CalTrans Specs and work <br />hours limitations (9:00 am to 3:00 pm). <br />. Permits and/or permit fees to be provided by the City of Redwood City. <br />. Fermin Sierra Construction, Inc. Is available to start work within one (1) week <br />with notice. <br /> <br />Please feel free to contact me with any questions or for more Information concerning <br />this proposal at (510) 471-1474 - office or (510) 773-0526 - cell. <br /> <br />Thank you, <br /> <br />~Þ:~ <br /> <br />Francisco V. Sierra <br />General Manager <br />Fermin Sierra Construction, Inc. <br /> <br />-." T" <br />