My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Wood Rdogers, Inc. Broadway / Douglas
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 Wood Rdogers, Inc. Broadway / Douglas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2017 4:11:33 PM
Creation date
12/18/2017 3:57:57 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Wood Rodgers, Inc.
PROJECT NAME
Broadway/Douglas Storm drainage and flooding Study for Broadway Plaza
RMP File Number
304.5
Date
12/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 3.7 —Run Desian Conditions <br />A 10 -year, 30 -year, and a 100 -year design storm will be used as input to the (parameter) <br />calibrated interior and boundary condition model. Both will use a dynamic tidal boundary <br />condition at San Francisco Bay, with the peak flow from the pump stations timed to match the <br />Mean Higher High Water (MHHW) in the Bay. A 100 -year tidal boundary condition will then be <br />matched with a 2 -year design storm to define the tidal flooding deficiencies. This model will <br />define existing tidal flood control deficiencies. Sea level rise will also be accounted for in the <br />analysis. <br />Task 3.8 —Mao 10-vear, 30-vear, and 100-vear Floodolain <br />A 10 -year, 30 -year, and a 100 -year floodplain map will be developed. <br />Task 4 Technical Memorandum <br />Task 4.1 — Develoo Technical Memo <br />Wood Rodgers will develop a short technical memorandum, documenting the analysis and the <br />results. The 10-, 30-, and 100 -year impacts of the proposed development (which are expected <br />to be minimal) will be documented. Pre- and Post -project 100 -year floodplain maps will be <br />included. <br />Fee <br />Each task, as outlined, will be performed on a Time & Materials (T&M), not to exceed basis. <br />SCOPE OF WORK - FEES <br />Task 1: Project Management <br />Task 2: System Review & Research, Field Reconnaissance <br />Task 3: Hydrologic & Hydraulic Model <br />Task 4: Technical Memorandum <br />TOTAL FEE <br />REV: 11-01-17 PR <br />Page 11 of 11 <br />ATTY/AGR.2017.244/Wood Rogers - Broadway/Douglas Storm Study <br />$4,385 T&M <br />$2,800 T&M <br />$24,910 T&M <br />12,260 T&M <br />34,355 T&M <br />
The URL can be used to link to this page
Your browser does not support the video tag.