Notification #1600.2013.0356-R3 <br />Streambed A teration Agreement <br />Page 5 at 23 <br />2. Avoidance and Minimization Measures <br />To avoid or minimize adverse impacts to fish and wildlife resources identified above, <br />Permittee shall implement each measure listed below. <br />2.1 Work location Restriction. At Site 1, to protect saltmarsh harvest <br />mouse and other saltmarsh species, routine maintenance activities <br />shall be limited to Atherton Creek upstream of the bridge at the <br />intersection of 3723 South Haven and Bayfront Expressway, <br />2,2 Seasonal Work Period. To protect fish and wildlife and their habitats, <br />work within the stream and riparian zone shall be limited to April 15 <br />to October 31. <br />2.2.1 Work Period Modification. If Permittee needs more time to <br />complete project activities, work may be authorized outside <br />of the work period and extended on a day-to-day basis by <br />CDFW representative, Suzanne Deleon, at <br />suzanne.deleon4wildlife.ca.aov, or if unavailable, through <br />contact with the CDFW Bay Delta Regional Office by mail, <br />phone (707-944-5500) or fax (707-944-5553). Permittee <br />shall submit a written request for a work period variance to <br />CDFW for approval at least five (5) calendar days prior to <br />November 1. The work period variance request shall: 1) <br />describe the extent of work already completed; 2) detail the <br />activities that remain to be completed; 3) detail the time <br />required to complete each of the remaining activities; and 4) <br />provide photographs of both the current work completed and <br />the proposed site for continued work. Work period variances <br />are issued at the discretion of CDFW. CDFW will review the <br />written request to work outside of the established work <br />period and may require additional measures to protect fish <br />and wildlife resources as a condition for granting the <br />variance. Any additional measures shall be made part of <br />this Agreement. <br />2.3 Work Period in Dry Weather Onlv. Work within the stream and <br />riparian zone shall be restricted to periods of no or low stream flow, <br />low rainfall (less than %." per 24 hour period) and dry weather as <br />allowed during the work period specified in Measure 2.1. <br />2.4 Weather Forecasts. Precipitation forecasts and potential increases in <br />stream flow shall be considered when planning construction <br />activities. Permittee shall monitor the 72 -hour forecast from the <br />National Weather Service (NWS; htto://www.nws.noaa.00vl. When <br />there is a forecast of more than 40% chance of rain, or at the onset <br />_AITviAGR 7017931 /City of Menlo Park - Mainfannnra An rPamPnt <br />