My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 City of Menlo Park - Atherton Channel maintenance
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 City of Menlo Park - Atherton Channel maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2017 7:49:17 AM
Creation date
12/20/2017 7:42:58 AM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park
PROJECT NAME
Maintenance of Atherton Channel; Covers laor and equipment to clean the channel, Menlo Park to dispose of debris.
RMP File Number
304.5
Date
10/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. Remove vegetation and mow levee slopes and top of bank using hand tools. <br />c. Remove trees, shrubs, and emergent wetland plants from the Channel if they are <br />below ordinary high water and are restricting the capacity of the Channel or are <br />causing erosion. <br />d. Prune branches overhanging the Channel and impacting water flows. Branches <br />in the lower third of any woody plant and less than three (3) inches in diameter <br />may be trimmed. <br />e. Trim understory ground cover and vines (e.g., mugwort, blackberry, ferns) only <br />as needed. <br />Cut off woody and herbaceous plants, fallen trees or trunks lodged in the bed or <br />bank causing flow restriction at the bed or bank invert with small tools and <br />remove with winch and cable. Root structures shall not be excavated or <br />disturbed. No vegetation shall be removed by excavation or cutting off below the <br />soil. <br />g. No equipment shall be operated within the drip line of trees. Protective fencing <br />shall be placed around the drip lines to prevent compaction of the root zone. No <br />bulldozers, backhoes, or other heavy equipment shall be used to remove trees. <br />3. Remove invasive, non-native plants using hand tools. <br />4. Allow wildlife to leave the project site unharmed if encountered during the maintenance <br />activities. <br />5. All personnel/work crew shall receive the education session conducted by a qualified <br />biological monitor or biologist on species that may be present at the site before <br />commencement of work. <br />6. Spoils shall not be placed where it could enter the stream, riparian or wetland areas. <br />Spoils shall be deposited at the end of Haven Court cul-de-sac on the pavement to de - <br />water. Once dry, the debris will be disposed of by the City of Menlo Park and Recology. <br />To the extent possible, vegetation, recyclable materials such as bottles and cans should <br />also be separated out. <br />If the City of Menlo Park cannot accommodate the spoils, the City of Redwood City shall <br />transport and dispose of the spoils in accordance with statutes and regulations. The City <br />of Redwood City shall bill the City of Menlo Park for actual, full costs associated with the <br />testing, transport and disposal of spoils. <br />PROTECTION OF CHANNEL: <br />Pursuant to the CDFW SAA, the following measures shall be taken to protect the Channel: <br />1. A clamshell bucket, hand tools or a small mower shall be used to remove vegetation <br />from the Channel. <br />2. No equipment shall be placed or operated in the Channel. <br />3. Mowing shall only occur on top of bank above ordinary high water level and shall not <br />occur within the Channel or lower bank. <br />ATTY/AGR.2017.231/City of Menlo Park - Maintenance Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.