My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 City of Menlo Park - Atherton Channel maintenance
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Under 60K
>
Agmt17 City of Menlo Park - Atherton Channel maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2017 7:49:17 AM
Creation date
12/20/2017 7:42:58 AM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Menlo Park
PROJECT NAME
Maintenance of Atherton Channel; Covers laor and equipment to clean the channel, Menlo Park to dispose of debris.
RMP File Number
304.5
Date
10/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
comply with all City of Menlo Park standards. Construction operations shall be conducted in <br />such a manner to cause as little inconvenience to vehicle traffic as possible. <br />SCHEDULE, WORK DURATION AND HOURS: <br />The maintenance activities are tentatively scheduled for the month of October 2016, and will be <br />performed between 6:00 AM to 6:00 PM on Saturdays and Sundays, except when otherwise <br />specified by Public Works. This work is estimated to be completed in five (5) days. <br />WORKER ACCESS TO FACILITIES: <br />The City of Redwood City shall provide access to toilet facilities for its workers. There are no <br />public facilities near the work site. <br />POLLUTION CONTROL: <br />The City of Redwood City shall follow all City of Menlo Park NPDES requirements and Best <br />Management Practices (e.g., straw or fiber rolls, storm drain filters) to keep miscellaneous litter <br />and trash out of the Channel and storm drains. The City of Redwood City shall keep the City of <br />Menlo Park right of way clean of debris, except for areas used for de -watering of spoils. After <br />removal of de -watered spoils, the City of Redwood City shall leave the area in as clean a <br />condition as it was before the work. <br />Attachments: <br />Attachment A — CDFW Streambed Alteration Agreement <br />Attachment B - Site Plan <br />ATTY/AGR.2017.231/City of Menlo Park - Maintenance Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.