My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt97 Westport Joint Venture
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1997
>
Agmt97 Westport Joint Venture
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2017 9:21:29 AM
Creation date
12/20/2017 9:21:16 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Westport Joint Venture
PROJECT NAME
Water Main Improvements - Westport Office Park
RMP File Number
304
Date
9/12/1997
Reso Ref
13162
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Owner shall furnish City with a complete set of plans and drawings showing the <br />Improvements in their actual or "as built' condition and location. <br />7. Guarantee of Workmanship and Materials. Owner agrees that if, <br />within a period of one (1) year after final acceptance of any work done under this <br />agreement, the improvements furnished and/or installed or constructed or <br />caused to be constructed by Owner, or any of the work done under this <br />agreement, fails to fulfill any of the requirements of this agreement, or the plans <br />and specifications referenced herein, Owner shall upon receipt of a request in <br />writing from City directing the work to be done, without delay and without any <br />cost to City, repair or replace or reconstruct any defective or otherwise <br />unsatisfactory part or parts of the Improvements or work. Should Owner fail to <br />act promptly to make such repair, replacement, or reconstruction, or otherwise to <br />act in accordance with this requirement to repair, replace, or reconstruct, or <br />should the exigencies of the case require that repair, replacement, or <br />reconstruction be made before Owner can be notified, the City may, at its option, <br />make the necessary repair, replacement, or reconstruction or perform the <br />necessary work, and Owner shall pay to City the actual cost of thereof plus <br />fifteen (15) percent. <br />Notwithstanding any provision to the contrary as set forth in this <br />agreement, Owner shall not be responsible for repair, replacement, or <br />reconstruction of any Improvements, necessitated by Acts of God, acts of third <br />parties (other than Owner, its agents, employees, or contractors) beyond <br />F:\shared\Redwood\Council 6 <br />Agmt-107 <br />FXS:rg <br />08/20/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.