Laserfiche WebLink
<br />STIP Amendment 945-1 <br />June 1-2, 1994 <br />Page 2 <br /> <br />The existing STIP project would be split into two projectS. One project at $550,000 for preli:ninary <br />engineering, EIR eroc~ss, ROW research and appraisal a.1d design plans to 35% completion and a <br />second project at .~ 11,350,000 for final design and construction. with both projects rema.iplng in FY <br />1998/99. <br /> <br /> II <br />I ! I <br />J Ii <br />I-I~ I <br />~ ~I <br /> <br />Additionally, this amendment provides for an AB3090 pa)' back for ~he preliminary engineering portion ð i I <br />for work on the \\l1ipple Avenue Grade Separation project along the Peninsula Commute Service (PCS) t? -U <br />Corridor. This will allow Redwood City to advance the preliminary engineering portion of the project < ~ ¡ <br />from FY 1998/99 to 1993/94. The cost of the CAB 3090) project is $550.000 and payback will be subject --- <br />to availability of funds. ' <br /> <br />... <br />