My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Lucent Technologies
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Lucent Technologies
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 3:10:50 PM
Creation date
8/31/2005 8:42:46 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Lucent Technologies
PROJECT NAME
CAD - RMS Mapping System agreement & software license
RMP File Number
304
Date
3/22/1999
Box
6001
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Redwood City Police <br /> Department System Performance <br /> �' 'i'he system performance using RD-LAP 19200 protocol with the <br /> � standard load profile is shown below: <br /> #of NIDDs IBC UTIL OBC UTIL RNC U'TIL <br /> 50 13% 12% 3.0% <br /> 100 27% 25% 7.0% <br /> 150 40% 38% 11 % <br /> 200 54% 51% 14% <br /> Table 5- System Resource Utilization, 19.2 kbps <br /> The system performance using RD-LAP 19,200 protocol with the <br /> standard load profile and reports is shown below: <br /> #of MDDs IBC UTIL OBC iJTIL RNC UTIL <br /> Sp 19% 15% 4°�u <br /> 100 38% 30% 8% <br /> 150 57% 46% 12% <br /> 200 76% 64% 16% <br /> Table 6- System Resource Utilization Reports, 19.2 kbps <br /> - The system performance using RD-LAP 19,200 protocol with the <br /> standard load profile,re�wrts, and AVL is shown below: <br /> #of NIDDs IBC UTIL OBC UTIL RNC UTIL <br /> 50 43% 30% 5.0% <br /> 100 49% 34% 10% <br /> 150 74% 54% 15% <br /> 200 96% 78% 20% . <br /> Table 7 - System Resource Utilization Reports and AVL Loadiug, <br /> 19.2 kbps <br /> If the inbound channel, outbound channel or the RNC resource <br /> exceeds the 100%utilization point,the system can become <br /> saturated until the utilization of the resource returns to a lower <br /> level. From Motomla`s experience,the City of Hillsborough,the <br /> City of Redwood City, and the City of Foster City Police <br /> Departme�nts can expect the system to react to these utilizations in <br /> the following manners: <br /> , <br /> QM rrroror�ou► , 3 - 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.