My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2018-01-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2018
>
AgdaPkt 2018-01-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2018 12:26:31 PM
Creation date
1/18/2018 1:21:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/22/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
500
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.3.A. - Page 12 <br />The proposed Project Timeline is based on a design package to be awarded by March 2018 and <br />completed by November 2018 via the Livable Neighborhood Street Enhancement Program, from <br />which the 15 percent local match will be derived for this project. This will be followed by a <br />construction contract with construction to be complete by September 2019. <br />The project concept does include educational signage to be placed at four locations near the <br />intersection of 5th Avenue and Page Street where green infrastructure is planned. A sample <br />educational sign is attached in Attachement IV. The educational signs used would reflect the <br />specific project green infrastructure details and call out the Safe Routes to School features as <br />well that could be read by students en -route to school. <br />The bio -retention areas would be maintained along with existing bio -retention areas, green <br />spaces and public right -of- way by a combination of staff from the Parks, Recreation and <br />Community Services and Public Works Departments; these departments presently maintain <br />similar features at other City facilities and these items would be included as part of general <br />operations and maintenance. Safe Route to School features would be maintained by Public <br />Works. <br />Attachments (proposed project map, design concept, preliminary budget, other supporting <br />documentation): <br />1. Project Area Map <br />2. Project Concepts and ,Sizing Calculations <br />3. Preliminary Timeline and Cost Breakdown <br />4. Educational Signage <br />ATTYIAGR.2017.292/C1ty/County Asscoiation of Govemments <br />
The URL can be used to link to this page
Your browser does not support the video tag.