Laserfiche WebLink
8.C. - Page 12 <br />sources, in addition to the potential for inundation and sea level rise and <br />adaptation. <br />• Land Use and Planning: The EIR will describe the General Plan amendment <br />and rezoning actions necessary to implement the Project, and the potential <br />impacts of the Project on existing and planned land use characteristics in the <br />vicinity. The EIR will also describe and evaluate whether the proposed land <br />use development is consistent with applicable local and regional plans and any <br />applicable conservation plans. <br />• Mineral Resources: The EIR will assess whether the Project would result in <br />the loss of available known mineral resources or important recovery site. <br />• Noise: The EIR will describe potential construction period and long-term <br />operation (traffic, mechanical systems, etc.) noise impacts with the Project. <br />The EIR will consider the potential for ambient noise levels to exceed <br />established standards and assess the land use compatibility of areas proposed <br />for noise -sensitive land uses based on monitored noise levels and the <br />compatibility guidelines of the state. <br />• Population and Housing: The EIR will describe the anticipated effects of the <br />Project on existing and projected population and housing characteristics, <br />housing demands, and the local balance between housing and jobs in Redwood <br />City. In particular, the EIR will discuss if the resulting population growth with <br />the Project would be in a manner contemplated in the General Plan 2030, and <br />assess if it would displace existing housing or people, necessitating the <br />construction of replacement housing elsewhere in excess of that contained in <br />the City's Housing Element. <br />• Public Services and Recreation: The EIR will address potential impacts that <br />the Project could have to the demand for public services, including police <br />protection services, fire protection and emergency services, parks, and public <br />schools provided in Redwood City. Potential increases in demand for public <br />services will be reviewed to determine if new facilities will be required to <br />maintain acceptable levels of services. The EIR will also address potential <br />physical impacts related to recreational facilities that could occur with <br />implementation of the Project. <br />• Transportation, Circulation and Parking: The EIR will describe the <br />transportation and circulation implications of the Project, including its <br />incremental contribution to daily and peak hour traffic on local and regional <br />roadway facilities. The evaluation will include regional and local roadway <br />system impacts, transit implications, pedestrian and bicycle provision impacts, <br />and TDM opportunities. <br />• Utilities and Service Systems: The EIR will describe the Project impacts on <br />the local utility and service system infrastructure (water supply; sewer and <br />wastewater treatment; storm drainage; and solid waste) serving the Project area <br />and assess the adequacy of the infrastructure to serve future demand. <br />Alternatives. Pursuant to CEQA Guidelines Section 15126.6, the EIR will also identify and <br />conduct a comparative evaluation of a reasonable range of alternatives to the Project. The <br />EIR analysis will include, but not be limited to, examination of the CEQA-mandated No <br />Project Alternative, and other potential alternatives that may be capable of reducing or <br />avoiding potential environmental effects. <br />C! <br />