My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt18 MCImetro Access Transmission Services Corp. DBA Verizon Access Transmission Services
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2018
>
Agmt18 MCImetro Access Transmission Services Corp. DBA Verizon Access Transmission Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2018 4:06:21 PM
Creation date
1/18/2018 4:06:01 PM
Metadata
Fields
Template:
Agreement
Contractor Name
MCImetro Access Transmission Services Corp. DBA Verizon Access Transmission Services
PROJECT NAME
Installation of Fibrer Optic Facilities
RMP File Number
304
Date
1/11/2018
MO Ref
18-001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Uniform Regulatory Framework companies, and interexchange services throughout the State of <br />California. <br />1.6 Facilities — means fiber optic cables, coaxial and copper cables, conduits, converters, <br />splice boxes, cabinets, handholes, manholes, vaults, equipment, drains, surface location marker, <br />appurtenances, and related facilities located or to be located in the Public Rights -Of -Way of the City <br />and used or useful for the transmission of telecommunication data. <br />ARTICLE 2 <br />INSTALLATION AND MAINTENANCE OF FACILITIES <br />2.1 Permitted Installations. During the term of this Agreement, Company may install, <br />maintain, operate, relocate and remove the Facilities within the City's Public Rights -Of -Way subject <br />to the issuance of required encroachment and building permits and approvals. The Facilities shall be <br />shown and described in permit applications filed with the City Engineer and may be modified by <br />subsequent permits approved by the City. All Facilities to be installed, maintained, operated, <br />relocated and removed under this Agreement shall be underground in areas where all existing utilities <br />are already underground or all new utilities are being installed underground; provided, however, that <br />in those areas where poles exist and electric and telephone lines are overhead, Company may install <br />fiber optic cables overhead if using the same poles (subject to the approval of the pole owner and <br />City); and further provided that whenever and wherever the owner of the poles moves its plant from <br />overhead to underground placement in an area, all Company's facilities must be relocated and moved <br />underground as directed by the City Engineer, at Company's expense, and in accordance with then - <br />existing City practices, policies and regulations. <br />2.2 No Cost to City. The construction, installation, operation, maintenance, and removal <br />of any Facilities shall be accomplished (i) without cost or expense to the City and (ii) subject to the <br />prior approval of the City Engineer. Company shall maintain any such Facilities at all times in good <br />and safe condition and free from any nuisance to the satisfaction of the City Engineer. <br />2.3 Compliance with Code. Company shall comply with the provisions of the Redwood <br />City Code, as may be amended from time to time (the "Code"), including Chapter 11, Privately <br />Owned Utilities, and Chapter 29 Streets, Sidewalks and Work In or Use of City Right -of -Way. <br />Company shall also comply with applicable provisions of the City's Zoning Code, as amended from <br />time to time (the "Zoning Code"). In the event of a conflict between this Agreement and the Code <br />and/or the Zoning Code, the provisions of the Code and/or the Zoning Code shall apply. <br />2.4 Encroachment Permits. All work performed by Company under this Agreement <br />shall be made pursuant to individual encroachment permits. Company shall obtain encroachment <br />permits from the City for the installation of the Facilities and for any other work or activities within <br />the City's Public Rights -Of -Way as required by Chapter 29 of the Code. Company shall submit all <br />plans, schedules, and information required by the Code and the City Engineer. Company also shall <br />submit all required fees, cash deposits, bonds or other security required by the City Engineer in <br />accordance with the Code. All work within the Public Rights -Of -Way shall be performed in strict <br />compliance with the terms and conditions of this Agreement, the Code, and the pertinent <br />encroachment permit. Once a permit is issued, Company shall commence work and complete the <br />construction and installation of the Facilities in accordance with the Code and any construction <br />schedule approved by the City Engineer in the applicable permit. <br />ATTY/AGR/2017.284/MCIMETRO ACCESS TRANSMISSION SERVICES CORP D/B/A VERIZOON ACCESS TRANSMISSION SERVICES <br />REV: 12-04-17 PR <br />Page 2 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.