Laserfiche WebLink
The proposed Project Timeline is based on a design package to be awarded by March 2018 and <br />completed by November 2018 via the Livable Neighborhood Street Enhancement Program, from <br />which the 15 percent local match will be derived for this project. This will be followed by a <br />construction contract with construction to be complete by September 2019. <br />The project concept does include educational signage to be placed at four locations near the <br />intersection of 5th Avenue and Page Street where green infrastructure is planned. A sample <br />educational sign is attached in Attachement N. The educational signs used would reflect the <br />specific project green infrastructure details and call out the Safe Routes to School features as <br />well that could be read by students en -route to school. <br />The bio -retention areas would be maintained along with existing bio -retention areas, green <br />spaces and public right -of- way by a combination of staff from the Parks, Recreation and <br />Community Services and Public Works Departments; these departments presently maintain <br />similar features at other City facilities and these items would be included as part of general <br />operations and maintenance. Safe Route to School features would be maintained by Public <br />Works. <br />Attachments (proposed project map, design concept, preliminary budget, other supporting <br />documentation): <br />1. Project Area Map <br />2. Project Concepts and Sizing Calculations <br />3. Preliminary Timeline and Cost Breakdown <br />4. Educational Signage <br />ATTY/AGR.2017.292/City/County Asscoiation of Governments <br />