My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2017-117016 STMMA 1409 ECR
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2017-117016 STMMA 1409 ECR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2018 12:56:14 PM
Creation date
1/29/2018 12:48:32 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMA 1409 El Camino Real
Doc Num
2017-117016
Rec Date
12/28/2017
APN
053-176-110,120,130,140,150, 160
Address
1409 El Camino Real
Parties
G.S> Diller Subsidiary, LLC
MO Ref
17-204
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />RWC IV - Diller <br />1409 EI Camino Real <br />Storm Water Treatment Operation and Maintenance <br />Inspection Report to the City of Redwood City, California <br />This report and attached Inspection and Maintenance Checklists document the inspection and <br />maintenance conducted for the identified storm water treatment measure(s) subject to the <br />Maintenance Agreement between the City and the property owner during the annual reporting <br />period indicated below. <br />I. Property Information: <br />Property Address or APN: 053-176-01. 11.12.13, 14, 15 & 16 <br />Property Owner: GS Diller subsidiarv. LLC <br />IL Contact Information: <br />Name of person to contact regarding this report: Jonathan Haves <br />Contact Number: (415) 489-3906 Email: !havesPerevstar.com <br />Address to which correspondence regarding this report should be directed: <br />450 Sansome Street. Suite 500 <br />San Francisco. CA 94111 <br />III. Reporting Period- <br />This report, with the attached completed inspection checklists, documents the inspections and <br />maintenance of the identified treatment measures during the time period from: <br />to <br />IV. Storm WaterTreatment Measure Information: <br />The following storm water treatment measures (identified treatment measures) are located on <br />the property identified above and are subject to the Maintenance Agreement: <br />Treatment Device Type of Treatment Location <br />Media Filter Vault #1 (7) 12"& 18" Stacked Inside building <br />Perk Filters <br />Media Filter Vault #2 (1) 12" Perk Filter In private alley <br />Detention Vault N/A Inside building <br />Page 1 0&M Inspection Report <br />Page 15 of 20 <br />REV: 10-25-17 PR <br />ATTY/AGR.2017.241/GS Diller Subsidiary, LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.