My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc 2017-117016 STMMA 1409 ECR
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc 2017-117016 STMMA 1409 ECR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2018 12:56:14 PM
Creation date
1/29/2018 12:48:32 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
STMA 1409 El Camino Real
Doc Num
2017-117016
Rec Date
12/28/2017
APN
053-176-110,120,130,140,150, 160
Address
1409 El Camino Real
Parties
G.S> Diller Subsidiary, LLC
MO Ref
17-204
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT C <br />RWC IV - Diller <br />1409 EI Camino Real <br />I. Routine Maintenance Activities <br />The principal maintenance objectives are to ensure that water flows unimpeded into the flow-through <br />planter and landscaping remains attractive in appearance. Table 1 shows the routine maintenance <br />activities, and the frequency at which they will be conducted. In addition, <br />Table i <br />Routine Maintenance Activities for Treatment Devices <br />No. Maintenance Task Frequency of Task <br />1 Remove accumulated sediment, litter, and debris from Kristar Media Filter and Before wet season and as <br />dispose of properly. Confirm that no clogging will occur and that the treatment necessary <br />device will drain per design standards. <br />2 Inspect Kristar Perk Filter Cartridgesto ensure that there are no clogs. Testwith Monthly during the wet season, <br />garden hose to confirm that the filters will drain per design standards. and as needed after storm events <br />3 Inspect podium drains, roof drains, and sheet flow from paved areas to ensure Monthly during the wet season, <br />flow to Kristar Media Filters Is unimpeded. Remove debris and repair damaged and as needed after storm events <br />pipes. Check splash blocks or rocksand repair, replace, and replenish as <br />necessary. <br />4 Inspect overflow pipe to ensure that it will safely conveyexcess flows tostorm Before the wet season, and as <br />drain. Repair or replace any damaged or disconnected piping. necessary <br />5 Inspect Kristar Media Filter to ensure that manhole is structurally sound(noI Annually <br />cracks or leaks). Repair as necessary. <br />6 Inspect Kristar Media Filter using the attached inspection checklist for Level 1,I Per manufacturers <br />Leve12, and Level 3 inspections lsee attached Kristar Flogard Perk Filter System recommendations (attached) <br />0 & M Manual) <br />7 Remove accumulated sediment, litter, and debris from Kristar Media Filter and <br />dispose of properly. Confirm that flow is directed to pump. <br />B Storm drain pumps for treatment and discharge follows will be maintained to <br />prevent failure. Inoperable pumps must be repaired or replaced immediately. <br />Page 2 <br />Page 18 of 20 <br />REV: 10-25-17 PR <br />ATTY/AGR.2017.241/GS Diller Subsidiary, LLC <br />Before wet season and as <br />necessary <br />On-going <br />
The URL can be used to link to this page
Your browser does not support the video tag.