My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Corrpro Companies
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Corrpro Companies
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2006 12:03:09 PM
Creation date
9/6/2005 10:08:41 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Corrpro Companies
PROJECT NAME
cathodic protection system upgrades
RMP File Number
304
Date
8/18/2005
MO Ref
05-145
Sticky Note
ID:
1
Text:
1 agreement
5 Payment bond
7 Faithful performance bond
Notice of Completion Conf. Copy 2006-139290 p. 9-10
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ; 'I C'C <br /> , . ~ ~ <br /> 'Ir\'..~t;' <br /> AGREEMENT <br /> for the <br /> City of Redwood City <br /> CATHODIC PROTECTION SYSTEM UPGRADES FOR THE <br /> TOPAZ AND REDWOOD SHORES WATER TRANSMISSION PIPELINES <br /> THIS AGREEMENT, made this ~ay of -iJ..>>~Jd-. 2005, by and between <br />Corrpro Companies, Inc., whose place f business is locate at 2799 Miller Street, San Leandro, <br />California ("CONTRACTOR"), and the City of Redwood City, a charter city and municipal <br />corporation of the State of California ("CITY"). <br /> In consideration of the mutual covenants hereinafter set forth, Contractor and City agree <br />as follows: <br />I. WORK <br /> A. Contractor shall complete all Work specified in the Contract Documents, in <br /> accordance with the Specifications, Drawings, and all other terms and conditions <br /> of the Contract Documents. <br />II. CONTRACT SUM <br /> A. City shall pay the Contractor as the "Contract Sum" for completion of Work in <br /> accordance with the Contract Documents, as the amount of Five Hundred Twenty <br /> Nine Thousand and No/100 Dollars ($529,000.00), computed in accordance with <br /> Contractor's Accepted Proposal dated, July 14, 2005, which Proposal is <br /> incorporated herein by reference thereto as if fully set forth. <br /> B. The Contract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor furnished by Contractor, its <br /> subcontractors, subconsultants, architects, engineers, and vendors or otherwise <br /> arising out of Contractor's performance of the Work, including any increases in any <br /> such taxes during the term of this Agreement; and any duties, fees, and royalties <br /> imposed with respect to any materials and equipment, labor or services. The taxes <br /> covered hereby include (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes, customs, duties, and any and all other <br /> taxes on any item or service that is part of the Work, whether such taxes are <br /> normally included in the price of such item or service or are normally stated <br /> separately. Notwithstanding the foregoing, each party shall bear such state or local <br /> inventory, real property, personal property or fixtures taxes as may be properly <br /> assessed against it by applicable taxing authorities. <br />III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall complete the Work within the following Schedule reflecting the date <br /> the Contract Time commences to run as set forth in Section 00550 (Notice to <br /> Proceed) and Section 00700 (General Conditions); and <br /> 1. Contractor shall achieve Substantial Completion of the Work within One <br /> Hundred Eighty (180) Calendar Days from the date the Contract Time <br /> commences to run. <br />Atty/Agr/2005.030 <br />071805 -1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.