My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2005-09-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2005
>
AgdaPkt 2005-09-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2012 4:45:24 PM
Creation date
9/8/2005 1:47:43 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/12/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/7/-(LJ <br /> <br />TABLE NO. 1-A <br />BUILDING PERMIT FEES <br /> <br /> <br />Building Moving Permits (RC. Ord. Sec. 9.22-9.39) <br />Application fee <br />I nspection fee: <br />Building located in Redwood City <br />Building located outside Redwood City <br /> <br />Reports for inactive permits <br />> $10,000.00 valuation <br />< $10,000.00 valuation <br />Sub- ermits <br />Combination Fee (Electrical, Plumbing & Mechanical Permit Fee) <br />All restaurant and medical buildings <br />All other buildings <br />Dwellin additions and interior alterations <br />Strong Motion Instrumentation Fees <br /> <br />For use of outside consultants for plan checking and inspections, <br />or both <br />Plan review fee <br /> <br />Fire, Planning, Engineering plan review fee <br /> <br />Minimum Buildin ermit fee, si n ermit <br />Minimum Plumbing, Mechanical, Electrical, sidewalk/driveway <br />ermit fee <br /> <br />1 Actual costs include administrative and overhead costs. <br /> <br />Atty/Reso/Reso .1549 <br />071105 <br /> <br />4 <br /> <br />$100.00 per hour <br /> <br />$100.00 <br />$100.00 per hour <br /> <br />$100.00 per hour <br /> <br />5% of base fee <br />6% of base fee <br />8% of base fee <br />10% of base fee <br /> <br />$250.00 <br />$250.00 plus $50 <br />er unit <br /> <br />$250.00 <br /> <br />$200.00 <br />$200.00 plus travel <br />expenses and <br />$100.00 per hour <br />travel time <br /> <br />$500.00 <br />$300.00 <br />$ 50.00 <br /> <br />130% of base fee <br />80% of base fee <br />25% of base fee <br />As required by <br />State of California <br />Actual Costs <br /> <br />70% of Table 1-A <br />Building Permit Fee <br />30% of Table 1-A <br />Buildin Permit Fee <br />$75.00 <br />$50.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.