My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2005-09-12
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2005
>
AgdaPkt 2005-09-12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2012 4:45:24 PM
Creation date
9/8/2005 1:47:43 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
9/12/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.4'./I-¿' <br /> <br />EXHIBIT "A-1" <br /> <br />SCOPE OF SERVICES <br /> <br />The scope of services shall be apply to pumps at pump station locations identified by the <br />City for the following utilities: Storm Sewer and Water Utility Systems. <br /> <br />Specifications for Pump Reconditioning, Rebuild and Repair: <br /> <br />1 . Contractor is responsible for removing / pulling pumps -Contractor to supply all needed <br />equipment for removing I pulling pumps and transporting for reconditioning and return delivery and <br />installation of pumps. <br /> <br />2. Complete disassemble and inspection of pumps within 10 days of pulling pump from <br />service. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />7. <br /> <br />8. <br /> <br />a. <br /> <br />Provide an inspection report to the City representative (usually the Utility Specialist) <br />whom will provide authorization to proceed with work. <br /> <br />All work performed must conform to the following requirements: <br /> <br />a. <br />b. <br />c. <br />d. <br /> <br />Straighten and balance impeller <br />Sandblast and epoxy coat inside and outside of column pump. <br />Reassemble pump. <br />Polish and straighten shafting to .0005 per foot I total indicated run out not to <br />exceed .002 per inch. <br />Check all aligning registers. <br />Dynamic balance impeller <br />Replace bearings and seals. <br /> <br />e. <br />f. <br />g. <br /> <br />When required, replace the following parts: <br /> <br />1 416 SS Line <br />1 416 SS Line Shaft <br />1 416 SS Head Shaft <br />1 Bronze Suction Bowl Bearing <br />1 Bronze Lower Bowl Bearing <br /> <br />1 Bronze Upper Bowl Bearing <br />2 Oil Tube Line Shaft Bearing <br />1 Top Oil Tube Tension <br />Bearings <br />1 Shaft Lip Seal <br /> <br />All replacement parts must meet manufactures specifications. <br /> <br />Major parts such as bowls and impellers must be same as pump manufacturer. <br /> <br />All nuts and bolts to be 316 SS (stainless steel) <br /> <br />The City retains the right to inspect pumps during disassemble and inspection, and to <br />inspect any and all replaced parts. <br /> <br />Amendment to AddTime-ChangeScope-FeeSchedule <br />City Attorney Approved Version 090103 3 <br /> <br />Amendment No.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.