My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-02-11
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-02-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:51:38 PM
Creation date
3/11/2002 8:44:44 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
2/11/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phase 1 - Environmental Site Characterization <br /> Sequoia Station Shopping Center <br /> Redwood City, California <br /> <br />Task I - CPT Investigation and Cross-Section Generation <br /> Principal Scientist 2 hrs~ $ 151 /hr $ 302 <br /> Associate Geologist 8 hrs~ $ 132 /hr $ 1,056 <br /> Staff Engineer 24 hrs~ $ 76 /hr $ 1,824 <br /> Drafting 8 hrs~ $ 67 /hr $ 536 <br /> CPT Subcontractar 1.5 days~ $ 4,100 /day $ 6,150 <br /> Drilling Permit 1 fee $ 426 $ 426 <br /> Utility Locatim. Company 1 fee $ 400 $ 400 <br /> $ 10,694 <br /> <br />Task 2 - Depth Discrete Groundwater Sampling and Analyses <br /> Principal Scientist 4 hrs~ $ 151 /hr $ 604 <br /> Associate Geologist 12 hrs~ $ 132 /hr $ 1,584 <br /> Staff Engineer 120 hrs~ $ 76 /hr $ 9.120 <br /> DirectPush Subcontractor 9 days~ $ 2,100 /day $ 18,900 <br /> Soil Sample Analyses <br /> HVOCs (EPA 8260) 15 samples~ $ 94 /sample $ 1,410 <br /> Groundwater Sample Analyses <br /> HVOCs (EPA 8260) 43 samples~ $ 94 /sample $ 4,042 <br /> $ 35,660 <br /> <br />Task 3 - Soil Gas Survey <br /> Principal Scientist 2 hfs@ $ 151 /hr $ 302 <br /> Associate Geologist 3 hrs~ $ 132 /hr $ 396 <br /> Staff Engineer 12 hrs.. $ 76 /hr $ 912 <br /> Field Supplies 1 fee $ 200 $ 200 <br /> Direct Push Subcontractor 1 days~ $ 2,100 /day $ 2.100 <br /> Soil Gas Analyses <br /> HVOCs(EPATO-14) 8 samples~ $ 350 /sample $ 2,800 <br /> $ 6,710 <br /> <br />Task 4 - Sensitive Receptor Survey and Site Conceptual Model <br /> Principal Scientist 2 hrs~ $ 151 /hr $ 302 <br /> Associate Scientist 8 hrs~ $ 132 /hr $ 1.056 <br /> Staff Engineer 50 hrs,) $ 76 /hr $ 3,800 <br /> $ 5,158 <br /> <br />Task 5 - Data Compilation and Evaluation <br /> Principal Scientist 2 hrs~ $ 151 /hr $ 302 <br /> Associate Scientist 4 hrs~ $ 132 /hr $ 528 <br /> Staff Engineer 24 hrs~ $ 76 /hr $ 1,824 <br /> $ 2,654 <br /> <br />Task 6 - Report Preparation <br /> Principal Scientist 6 hfs@ $ 151 /hr $ 906 <br /> Associate Geologist 10 hrs~ $ 132 /hr $ 1,320 <br /> Staff Engineer 50 hrs~ $ 76 /hr $ 3,800 <br /> Drafting 10 hrs~ $ 67 /hr $ 670 <br /> Clerical 4 hrs~ $ 52 /hr $ 208 <br /> $ 6,904 <br /> <br />Task 7 ~ Consultation and Meetings <br /> Principal Scientist 40 hrs~ $ 151 /hr $ 6.040 <br /> Staff Engineer 40 hrs~ $ 76 /hr $ 3,040 <br /> $ 9,080 <br /> <br /> TOTAL $ 76,860 <br /> <br /> ~/Harding ESE <br /> .[/~ MACTEC <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.