My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-01-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:51:41 PM
Creation date
3/11/2002 9:12:16 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
1/28/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK ORDER / ADDITIONAL SERVICES <br /> NO. 1 <br /> <br />This Task Order is entered into pursuant to the terms and conditions of the following <br />described agreement (the "Agreement"), entered into by and between the City of <br />Redwood City, a municipal corporation of the State of California (the "City") and the <br />contractor (the uContractor") hereinafter identified: <br /> <br />Title of Agreement: "Professional Consulting Engineering Services -Water <br /> Recycling Feasibility Study" <br /> <br />Contractor: Kennedy/Jenks Consultants <br />Date of Agreement: July 18, 2001 <br /> <br />1. Task Described. Contractor shall perform the following services, which are in <br /> addition to those services described in the Agreement. <br /> <br /> Description of Services: <br /> Pre-design study for the proposed Highway 101 Bike Path Recycled Water <br /> Transmission Line, approximately 1.2 miles in length. <br /> · Coordinate and interface as needed with staff from CalTrans, San Mateo <br /> County Transportation Authority, San Francisco Bay Conservation and <br /> Development Commission, U.S. Army Corp of Engineers, and Department of <br /> Fish and Game to ensure project viability. <br /> · Compile checklist report of all technical requirements, permits, and potential <br /> costs associated with final design specifications and bid documents for <br /> inclusion in CalTrans call for bids as an add-alternative bid item. <br /> <br />2. Compensation. City shall compensate Contractor for the services described in this <br /> Task Order based upon the rates of charge and method of calculation described in <br /> the Agreement. <br /> <br /> Compensation 'shall be provided as follows: <br /> Not-to-exceed amount of agreement shall be amended from $155,000.00 to <br /> $175,000.00. <br /> <br />3. Time of Performance. Contractor shall perform the services to be provided <br /> pursuant to this Task Order on or before the following: <br /> <br /> Date of Completion: March 1, 2002 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.