Laserfiche WebLink
09/12/2005 <br />TABLE 1 -B <br />MECHANICAL PERMIT FEES <br />Permit Issuance <br />1. For the issuance of each permit .............................. ............................... $40.00 <br />Unit Fee Schedule <br />(Note: The following do not include permit - issuing fee.) <br />1. Furnaces <br />For the installation or relocation of each forced -air or gravity -type <br />furnace or burner, including ducts and vents attached to such <br />appliance, up to and including 100,000 Btu /h (29.3 kW) .................... <br />$13.00 <br />For the installation or relocation of each forced -air or gravity -type <br />furnace or burner, including ducts and vents attached to such <br />appliance over 100,000 Btu/h (29.3 kW) ............. ............................... <br />$16.00 <br />For the installation or relocation of each floor furnace, including <br />vents.................................................................... ............................... <br />$13.00 <br />For the installation or relocation of each suspended heater, <br />recessed wall heater or floor- mounted unit heater ............................. <br />$13.00 <br />2. Appliance Vents <br />For the installation, relocation or replacement of each appliance <br />vent installed and not included in an appliance permit ......................... $7.00 <br />3. Repairs or Additions <br />For the repair of, alteration of, or addition to each heating appliance, <br />refrigeration unit, cooling unit, absorption unit, or each heating, <br />cooling, absorption or evaporative cooling system, including <br />installation of controls regulated by the Mechanical Code .................. $12.00 <br />4. Boiler Compressors and Absorption Systems <br />For the installation or relocation of each boiler or compressor <br />to and including three horsepower (10.6 kW), or for each <br />absorption system to and including 100,000 Btu /h (29.3 kW) ............ $13.00 <br />For the installation or relocation of each boiler or compressor <br />over three horsepower (10.6 kW) to and including 15 horsepower <br />(52.7 kW), or for each absorption system over 100,000 Btu/h <br />(29.3 kW) to and including 500,000 Btu /h (146.6 kW) ........................ $24.00 <br />For the installation or relocation of each boiler or compressor <br />over 15 horsepower (52.7 kW) to and including 30 horsepower <br />(105.5 kW), or for each absorption system over 500,000 Btu /h <br />(146.6 kW) to and including 1,000,000 Btu/h (293.1 kW) ................... $33.00 <br />For the installation or relocation of each boiler or compressor <br />over 30 horsepower (105.5 kW) to and including 50 horsepower <br />(176 kW), or for each absorption system over 100,000 Btu/h <br />(293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) ................... $50.00 <br />For the installation or relocation of each boiler or compressor <br />over 50 horsepower (176 kW), or for each absorption system <br />Atty /Reso /Reso.1549 14668 <br />071105 6 Muff # 505 <br />