My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 H & R Builders dba HRB C
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 H & R Builders dba HRB C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2005 12:10:31 PM
Creation date
9/20/2005 10:21:12 AM
Metadata
Fields
Template:
Agreement
Contractor Name
H & R Builders dba HRB Construction
PROJECT NAME
Veterans Memorial Senior Center HVAC project
RMP File Number
304
Date
9/14/1999
Reso Ref
13668 13725
MO Ref
00-326
Box
6039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />It is further agreed that in case the work called for under this Agreement is not <br /> <br />completed in all of its parts and requirements within the number of calendar days specified, <br /> <br />City shall have the right to increase the number of working days or not, as may seem best <br /> <br />to serve the interest of City; and if it is decided to increase the said number of working <br /> <br />days, City shall further have the right to charge to Contractor, and deduct from the final <br /> <br />payment for the work, all or any part, as City may deem proper, of the actual cost of <br /> <br />engineering, inspection, superintendence, and other overhead expenses of City which are <br /> <br />directly chargeable to this Agreement, except that the cost of final surveys and the <br /> <br />preparation of the final estimate shall not be included in such charges to be paid by <br /> <br />Contractor. <br /> <br />9. <br /> <br />Except as otherwise may be provided herein, Contractor hereby expressly <br /> <br />guarantees for one (1) full year from the date of the final completion of the work under this <br /> <br />Agreement and acceptance thereof by City's City Council, to repair or replace any part of <br /> <br />the work performed hereunder which constitutes a defect resulting from the use of inferior <br /> <br />or defective materials, equipment or workmanship. If, within said period, any repairs or <br /> <br />replacements in connection with the work are, in the opinion of the City's' Engineer, <br /> <br />rendered necessary as a result of the use of inferior or defective materials, equipment or <br /> <br />workmanship, Contractor agrees, upon receipt of notice from City, and without expense to <br /> <br />City, to promptly repair or replace such material or workmanship and/or correct any and all <br /> <br />defects therein. If Contractor, after such notice, fails to proceed promptly to comply with <br /> <br />Agmt-275 <br />FX5:djk <br />F :/5 h a red/Redwood/Cou neil <br />08/12/99 <br /> <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.