My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 Manna Consultants
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 Manna Consultants
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2005 12:10:03 PM
Creation date
9/22/2005 1:32:11 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Manna Consultants
PROJECT NAME
pro consulting engineering & design
RMP File Number
304
Date
12/5/2000
Reso Ref
14090
Box
6039
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TASK Princlpal-in- Project Project I Engineer I Project I CADD I Clerical I Manna T otal\ WRECO I I Geolech <br /> ACTIVITY DESCRIPTION Engineer Engineer APA (AIIO~ationl Total Hours <br />NO. charge Manager (Struct.) (Civil) (Mech.) Support Support Hours <br />Hourly <br />Rate $150.00 $135.00 $128.00 I $146.00 I $10.00 I $100.00 I $85.00 I $88.00 I $69.00 <br />1.00 PROJECT MANAGEMENT <br />1.01 Mobilization 15 <br />1.02 Develop project schedule and budget plans 20 40 10 10 <br />1.03 ¡ Review environmental impact reports, clearance, 40 40 I I I I I 20 <br />and mitigations requirements <br />1.04 ¡Conduct technical coordination meetings 60 30 r- I I I I 10 <br />'1.05 ¡prepare monthly invoices and monthly progress 10 10 10 10 I I I I I 10 <br /> reports <br />1.06 Bi-weekly technical progress reporls 30 10 <br />1.01 Maintain project files 30 20 <br />1.08 QA/QC 2 <br /> Task 1 Subtotal <br /> $1,050 $11,520 $0 $0 $0 $0 $15,042 $0 $0 $0 <br /> $11,812 $11,812 <br /> <br /> <br /> <br /> <br />2.00 35% SUBMITTAL <br /> PreliminarY Enaineerinq (Bridge) <br />2.01 Bridge foundations and earth retention systems 40 10 8 5 150 <br />2.02 Bridge type selection report 60 20 40 8 5 <br />2.03 Bridge construcion staging and consturctability 40 40 40 40 5 <br /> Survevs, maDDina & right-oF-way <br />2.04 Topographic surveys 80 <br />2.05 Research for boundary, deeds and maps 30 <br />2.06 Office engineering to prepare topographic survey 140 <br />map and boundary <br />2.07 Prepare deed description and plat for ROW 80 <br />dedication <br /> PreliminarY Enaineerina (Civíf} <br />2.08 Roadway alignment 10 40 30 <br />2.09 Roadway typical cross sections 10 40 30 <br />2.10 Roadway construction details 10 40 50 <br />2.11 Roadway drainage plans and profiles 10 40 50 <br />2.12 Roadway drainage details and quantities 10 40 50 <br />2.13 Pump Station 10 20 100 40 <br />2.14 Box Culvert 10 40 40 <br />2.15 Utility Plans 40 20 40 60 40 <br /> Miscellaneous Teclmica! Studies <br />2.16 HEC-RAS modeling & analysis 40 <br />2.17 Bridge scour analysis 44 <br />2.18 Pump station hydrology report 40 <br />2.19 Bridge drainage report 5 <br />2.20 Redwood Creek diversion/drainage report 25 <br />2.21 Box culvert drainage report 40 <br /> Task 2 Subtotal ".':¡ÞW{ WL¥jJf(ftilir¡¡ jŒif*h,lôlMœi ~':'y~) "'W,¡æ.WfilliiW _1)ij~jåW m;¡¡@iJfjìJlli¡r; WiKt1~**:# 1IDiæjjjMW IMBWØJi&4 I_SW¡W-\' <br /> <br /> -- 6-- --- 6- ~~~ . _ . -- --- h- --- 6. Mr _. - <br /> <br />$0 <br /> <br />$21,000 <br /> <br />$7,680 <br /> <br />$10,220 <br /> <br />$13,300 <br /> <br />$26,000 <br /> <br />$8,500 <br /> <br />$33,968 <br /> <br />$1,035 <br /> <br />$16,490 <br /> <br />$28,050 <br /> <br />$12,150 <br /> <br />$127,703 <br /> <br />$184,993 <br /> <br />City 01 Redwood CO, <br />Community Developmont SeNlces <br />Englne.,lng and Conshucllon <br />Bloomou;sl Stroot Exlonslon Pmjo,1 <br /> <br />Pag.'o12 <br /> <br />RC_PSE_',Rov1Nov6,OO <br />1116100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.