My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt05 Nolte Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2005
>
Agmt05 Nolte Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2005 9:21:22 AM
Creation date
10/17/2005 9:20:27 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Nolte Associates
PROJECT NAME
consultant - engineering design services
RMP File Number
304
Date
10/14/2005
MO Ref
05/195
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Redwood City <br />Pump Station #15 Rehabilitation <br /> <br /> TASKS Engr Strct Ass!. Jr. CADD Chief 2-Person Project Sub Subtotal Total Reim- Subtotal Total <br /> Assoc Mgr. Engr Engr Engr Tech III of Survey Srvy Crew Assist Consultan Hours Hours bursable Dollars Dollars <br /> Hours by Task byTask Costs by Task by Task <br /> $176 $157 $176 $118 $101 $115 $156 $236 $80 1.15 <br /> <br />A PROJECT MANAGEMENT <br /> 1 Coordination, Setup, Filing 2 8 2 12 $ 1,768 <br /> 2 QAlQC 6 6 $ 1,056 <br /> Subtotal 18 $ 2,824 <br /> <br />B SURVEYING AND EXISTING UTILITIES <br /> 1 Research Existing Utilities 4 8 12 $ 1,280 <br /> 2a Field Survey (WW) 8 8 $ 1,888 <br /> 2a Field Survey (Nolte) 8 4 12 $ 1,568 <br /> Subtotal 32 $ 4,736 <br /> <br />C PRELIMINARY STUDY <br /> 1 Preliminary Design Layouts <br /> 1a Hydraulic Calculations 1 4 6 11 $ 1,512 <br /> 1b Preparation of Preliminary Design Study 2 8 20 8 4 42 100 $ 5,323 <br /> 1c Electrical Preparation of Preliminary Design Study 1 1 29 31 2900 $ 3,572 <br /> 1d Meeting (1) 3 3 6 $ 999 <br /> Subtotal 79 $ 11,406 <br /> <br />D DESIGN DEVELOPMENT <br /> 1 Sixty-Five Percent (65%) Submittal <br /> 1a 65% Submittal-Plans, Specs, Costs 2 10 16 80 40 24 8 180 100 $ 21,733 <br /> 1b Electrical 80 80 7050 $ 8,108 <br /> 1c Meeting (1) 3 3 6 $ 999 <br /> <br /> 2 One-Hundred Percent (100%) Submittal <br /> 2a 100% Submittal-Plans, Specs, Costs 3 6 2 40 20 12 83 200 $ 10,172 <br /> 2b Meeting (1) 3 3 6 $ 999 <br /> Subtotal 355 $ 42,011 <br /> <br />E BIDDING PHASE <br /> 1 AssisUProvide Prospective Bidders, Addenda, Plan Chang 1 2 3 3 9 $ 1,189 <br /> 2 Review Bid Summaries 1 2 3 6 $ 844 <br /> Subtotal 15 $ 2,033 <br /> <br />F CONSTRUCTION PHASE <br /> 1 Shop Drawing Review 1 3 6 10 $ 1,355 <br /> 2 Site Visit 6 6 $ 70t! <br /> 3 Review and Change Orders 1 3 6 10 $ 1,253 <br /> Subtotal 26 $ 3,316 <br /> <br /> Total 29 56 18 176 74 47 4 8 15 109 536 525 10350 $ 66,326 $ 66,326 <br /> <br />Bl3112DO5 <br />N:\BDBALPA\Redwood CitylFeeR2.xls <br />
The URL can be used to link to this page
Your browser does not support the video tag.