My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-07-15
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:38 PM
Creation date
7/11/2002 1:53:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
7/15/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Block Two Development <br /> <br /> Market Conditions <br /> <br /> In the present market, there are currently few viable land uses that would also be compatible <br /> with the development that will occur on Block One and on adjacent blocks. An office <br /> building, as originally proposed, is no longer feasible due to the glut of office space currently <br /> available in our sub-regional market. Absorption of that space is expected to take several <br /> years. <br /> <br /> There has been considerable interest from hotel developers but they readily admit that <br /> financing may not be available in the present market. There has not been any expressed <br /> interest by housing developers for this particular site although there is general interest in the <br /> downtown overall. <br /> <br /> The City currently owns the majodty of Block Two (the parking lot). Since we have control of <br /> most of the site, it may be in our best interest to preserve development on that Block until <br /> later when the market retums and the overall economic conditions improve. It is expected <br /> that, with development of Block One as proposed, the value of Block Two could increase <br /> significantly in time. Waiting to develop the site would also allow more time to plan for the <br /> integration of Downtown, the train station and Sequoia Station at the juncture of Block Two <br /> and Winslow. <br /> <br /> We are continuing to investigate this option. Given this possibility we are taking a fresh look <br /> at parking. <br /> <br /> Downtown Parking <br /> <br />In anticipation of possible changes to the project, and to provide Council with as much <br />information as possible on which to make decisions, staff has conducted parking studies for <br />the entire downtown. We now have a complete inventor~ of the existing supply, including all <br />public (city and other agencies) and private spaces. With this information, we will be able to <br />develop an overall parking program for the entire downtown as it begins to revitalize. <br /> <br />An occupancy survey of existing spaces to determine utilization has also been completed. <br />This was done on three Fridays in April, and included an event at the Fox Theater. This <br />information becomes the basis for projecting future needs. <br /> <br />Additionally, a revised Retaii-Cinema project to include development on Block One only was <br />analyzed to determine the projected parking demand so that we would know what we need <br />to provide for a Block One project. <br /> <br />With the above information, working with the developer, some parking options were created. <br /> <br />The parking alternative that has the greatest appeal is one that includes underground <br />parking under the project on Block One. Between 200 to 600 spaces may be provided <br />depending on the number of levels. As we study this further, development constraints may <br /> <br />· Page 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.