My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2002-07-15
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2002
>
AgdaPkt 2002-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:38 PM
Creation date
7/11/2002 1:53:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Agency Type
City Council
Date
7/15/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
"ar, ! <br /> <br /> Task 3 - Water Quality Monitoring Program <br /> <br /> Kennedy/Jenks Consultants will propose specific revisions to the existing <br /> sampling and analysis plan and provide a water quality monitoring program to <br /> prevent water quality degradation in the distribution system and comply with <br /> regulatory requirements after the chlommine conversion. Kennedy/Jenks <br /> Consultants will consider the monitoring parameters usable to detect nitrification. <br /> This task will consist of the following steps: <br /> <br /> Review existing testing parameters, location of sampling stations, <br /> frequency and reporting procedures, <br /> <br /> · Identify necessary improvements related to water quality monitoring, <br /> including additional sampling stations, <br /> <br /> · Recommend a revised monitoring program for the distribution system <br /> and storage facilities, under conditions of chloramination, and <br /> <br /> · Estimate the cost and labor requirements associated with the revised <br /> monitoring program. <br /> <br /> The deliverable associated with Task 3 will be separate chapter in the final report <br /> that contains the review of the current monitoring program as well as the <br /> recommended new program and the costs associated with this program. <br /> <br /> Task 4 - Chloramine Conversion Water Quality <br /> Assurance Plan <br /> <br /> Kennedy/Jenks Consultants will prepare a detailed Chloramine Conversion <br /> Water Quality Assurance Plan specific for the City of Redwood City that will <br /> discuss water quality deterioration processes associated with the conversion of <br /> final disinfectant from chlorine to chloramines. The Plan will provide methods <br /> for identifying these processes including nitrification, reducing the potential for <br /> water quality deterioration, and for addressing nitrification in the event that it <br /> does occur. <br /> <br /> The deliverable for Task 4 will be separate chapter in the final report describing <br /> the steps necessary to maintain high quality water throughout the City's <br /> distribution system. <br /> <br /> Task 5 - Report Preparation and Project Meetings <br /> <br /> A final report will be developed that presents the evaluation and results <br /> associated with Task 1 through 4. This report will be developed in a draft form <br /> and submitted to RWC for review and comment. In order to obtain input fi'om <br /> RWC at critical times, meetings will be held at the following project milestone <br /> meetings will be held: <br /> <br /> · A project kickoff meeting will be held after the contract with RWC is <br /> signed, and before any work is started <br /> <br /> · A 50% project status meeting will be held after initial results are <br /> compiled, but before any formal report is prepared <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.