Laserfiche WebLink
<br />EXHIBIT A SCOPE OF SERVICES <br />SCADA Engineering Services for Recycled Water Project <br /> <br /> ~ ~ <br /> ~ 0 <br /> CI> 0 tI. <br /> ~ c: c:~ tI. tI. <br />Task ~ ê "E> c: tI. " <br /> c: .. ...c " II) <br /> CI> Ü :§~ II) ~ <br /> CI>.. .2 <br /> c: ~ ~ c:.. G> 0 <br /> -CI u .s:: > c: E <br /> ClO c: .!! u" 0 <br /> c: ~ G> G>_ .s:: G> Hours Cost <br /> WD.. (/) W =- D.. 0:: <br />2005-2006 Rates Hourly\ $ 110.00 $ 130.00 $ 98.00 $ 85.00 $ 85.00 $ 85.00 <br />Enoineerino Desion 4 4 $ 520.00 <br />Preoaration of alans !iDees. and drawinos 2 2 $ 260.00 <br />Coordination with trades and oaeratians 8 8 $ 1 040.00 <br />Coordination with enoineers on staff with Citv 2 2 $ 260.00 <br />Coordination with enoineers contracted to the Citv 0 0 $ <br />Plan saec. and submittal reviews 0 0 $ - <br />SCADA svstem inteoration and desion 2 2 $ 220.00 <br />SCADA syStem arooramminn 4 4 $ 440.00 <br />Procurement of ooods and services 2 2 $ 260.00 <br />Construction and o""rational assistance (Hard Labor Hours 8 8 $ 880.00 <br /> Subtotal Task 1 14 18 32 $ 3,880.00 <br />Enoineerino Desion 0 $ - <br />Preoaration of alans, saecs.. and drawinas 20 8 28 $ 3.240.00 <br />Coordination with trades and oaeratians 32 16 48 $ 5,600.00 <br />Coordination with enoineers on staff with Citv 16 16 $ 2 080.00 <br />Coordination with enoineers contracted to the Citv 4 4 8 $ 960.00 <br />Plan saec. and submittal reviews 0 $ - <br />SCADA syStem inteoration and desion 24 24 $ 3120.00 <br />SCADA syStem nrnnramminn 64 12 76 $ 8 600.00 <br />Procurement of nonds and services 8 8 16 $ 1 920.00 <br />Construction and o"..rational assistance <br /> Subtotal Task 2 128 88 216 $ 25,520.00 <br />Enoineerino Desion 4 4 $ 520.00 <br />Preaaration of alans saecs. and drawinas 0 0 $ <br />Coordination with trades and oaeratians 16 16 32 $ 3,840.00 <br />Coordination with enoineers on staff with Citv 16 16 32 $ 3.840.00 <br />Coordination with enoineers contracted to the Citv 16 16 32 $ 3 840.00 <br />Plan, saec., and submittal reviews 32 32 $ 4 160.00 <br />SCADA syStem inteoration and desian 16 16 $ 2,080.00 <br />SCADA svstem aroorammino 8 16 24 $ 2,960.00 <br />Procurement of ooads and services 8 8 16 $ 1 920.00 <br />Construction and oaerational assistance 8 8 16 $ 1 920.00 <br /> Subtotal Task 3 72 132 204 $ 25,080.00 <br />Review of Dlans. snecs. and submittals 16 20 36 $ 4,360.00 <br />Coordination with trades and .;n;:rations 20 24 44 $ 5 320.00 <br />Coordination with enoineers on staff with City 8 16 24 $ 2,960.00 <br />Coordination with enaineers contracted to the Citvlmeetinas 0 16 16 $ 2 080.00 <br />Construction and onerational assistance 16 16 32 $ 3,840.00 <br /> Subtotal Task 4 60 92 152 $ 18,560.00 <br />Develoa trainino arooram for staff Drier to and durino start.ua 8 32 $ 5 040.00 <br />Develoa the lono-term information I data svstem documentation after start ua 40 8 $ 5 440.00 <br />Trainino manuals and aroorams 8 8 $ 1 920.00 <br />Training manuals (clerical hours 1!11 $40/hr) 40 $ 1,600.00 <br />Trainino sessions 16 16 $ 3 840.00 <br /> <br /> <br /> <br /> <br /> <br /> Subtotal Task 5 72 104 $ 17,840.00 <br /> ¡~I%1:p~I!Çþ'1U T 1 I I 4521 $ 90,880.00 <br /> <br />~ <br />" <br />~ <br />~ <br />