Laserfiche WebLink
<br /> <br />JUG A 31 j( i Hi fj jlji I¡ -~' J~{ {) JvØ P )~ øJ Y, J yJ ( - <br />ProVf(ling Engineering; Surveying 11m! Plllnning Services <br /> <br />503 Seaport Court, Suite 105 <br />Redwood City, CA 94063 <br />PHONE (650) 363-8277 <br />FAX (650) 363-8279 <br /> <br />EXHIBIT "A" <br /> <br />May 22, 2006 <br /> <br />File No. 55-028513 <br /> <br />Mr. Peter Vorametsanti <br />Engineering & Construction <br />City of Redwood City <br />1017 Middletìeld Road <br />Redwood City, CA 94063 <br /> <br />RE: <br /> <br />Route 10// Ralstofl Avenue LllIulçcaping Project <br />PROPOSAL FOR EXTRA WORK (Amendmeflt No.1) <br /> <br />Dear Mr. Vorametsanti: <br /> <br />We are pleased to submit this proposal for additional design services for the Route <br />10 l/Ralston A venue Interchange Landscaping Project. These additional services have come <br />about due to: (a) an extension of the project landscaping limits along Marine Parkway from <br />Shoreway Road to Twin Dolphin Drive; (b) additional review cycles required by Ca!trans <br />that were not originally anticipated; (c) adjustments required in the landscaping design to <br />bring construction costs into line with available construction funds; and, (d) addition of bid <br />and construction support to the original scope. <br /> <br />SCOPE OF EXTRA WORK <br /> <br />Task 1 - Extend Marine Parkway Landscaping <br /> <br />. <br /> <br />Design additional landscaping and irrigation system fÒr approximateJy 530 <br />feet along south side of Marine Parkway between Shoreway Road and 'fwin <br />Dolphin Drive (see attached letter proposal from Sugimura & Associates), <br />Includes replacement of Redwood City irrigation controller east of Twin <br />Dolphin Drive <br />Includes additional MTCo time for plans & specifications and coordination <br /> <br />. <br /> <br />. <br /> <br />Task 2 - Additional Caltrans Review and Construction Cost Adjustments <br /> <br />. <br /> <br />Work with Caltrans to resolve supplemental comments on design features and <br />format and make additional submittals to Ca!trans <br />Make adjustments in design to reduce quantities and eliminate some items of <br />work to reduce overall construction cost of project <br />Revise plans and specifications to reflect design adjustments <br /> <br />. <br /> <br />. <br /> <br />ClJfERI NO <br /> <br />PI EASANWN <br /> <br />REDWOOD my <br /> <br />SACRAMENTO <br />\II\/vl, IlliIlJI/II)IJI.j.~ i"'11I <br /> <br />SALINAS <br /> <br />SAN JOSE <br /> <br />WAI NUT CREEK <br />